Browse
Search
Agenda - 06-29-1993 - VIII-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 06-29-1993
>
Agenda - 06-29-1993 - VIII-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 12:22:36 PM
Creation date
1/23/2017 12:17:01 PM
Metadata
Fields
Template:
BOCC
Date
6/29/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-B
Document Relationships
Minutes - 19930629
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 3 , paragraph 3 . 1 . 1 : The services described in this <br /> Article 3 are not included in Basic Services , unless so <br /> identified in Article 12 , or the attached Article 12-Exhibit A, <br /> and they shall be paid for by the Owner as provided in this <br /> Agreement, in addition to the compensation for Basic Services . <br /> The services described under Paragraphs 3 . 2 and 3 . 4 shall only be <br /> provided if authorized in advance in writing by the Owner . In <br /> the opinion of the Architect, if services described under <br /> Contingent Additional Services in Paragraph 3 . 3 are required, due <br /> to circumstances beyond the Architect' s control, the Architect <br /> shall notify the Owner of the need for these services and shall <br /> notify the Owner in writing prior to commencing such services . <br /> If the Owner deems that such services described under paragraph <br /> 3 . 3 are not required , the Owner shall give prompt written notice <br /> to the Architect. If the Owner indicates in writing that all or <br /> part of such Contingent Additional Services are not required , <br /> the Architect shall have no obligation to provide those <br /> services . If however, The Owner indicates that, in his <br /> opinion, the services described under paragraph 3 . 3 are required, <br /> due to circumstances within the control of the Architect, and <br /> directs such services be provided as part of Basic Services, <br /> the Architect reserves the right to furnish said services and <br /> file a claim for additional payment. <br /> Article 3 , paragraph 3 . 2 . 1 shall read : If the Owner and Architect <br /> agree that more extensive representation at the site than is <br /> described in Subparagraph 2 . 6 . 5 is required , the Architect shall <br /> provide one or more Project Representatives to assist in carrying <br /> out such additional- on-'site responsibilities , as Additional <br /> Services. <br /> Article 3 , paragraph 3 . 3 . 3 , shall read : Preparing Drawings , <br /> Specifications , and other documentation and supporting data, <br /> (evaluating contractors ' proposals deleted) and providing other <br /> services in connection with Change Orders and Construction Change <br /> Directives , provided such change orders and construction change <br /> directives are required by causes not within the control of the <br /> Architect. <br /> Article 3 , paragraph 3 .4. 1, is deleted. <br /> Article 3 , paragraph 3 .4 .6 , should be included as Basic Services , <br /> but only in order to arrive at a program of space needs . <br /> Article 3 , paragraph 3 . 4 . 16 , is deleted . <br /> Article 6 , paragraph 6 . 1 shall read : The Drawings , <br /> Specifications , and other documents prepared by the Architect for <br /> this Project are instruments of the Architect ' s service for use <br /> solely with respect to this Project, and, unless otherwise <br /> provided, the Architect shall be deemed the author of these <br /> documents and shall retain all common law, statutory , and other <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.