Orange County NC Website
18 <br /> TriuviS AND CONDITIONS OF AGREEMENT BETWEEN OWNER AND ARCHITECT <br /> ARTICLE 1 schedule or construction budget, the Architect shall prepare, <br /> for approval by the Owner, Design Development Documents <br /> ARCHITECT'S RESPONSIBILiTIES consisting Of drawings and other documents to lox and describe <br /> the size and character of the Project as to architectural, stoic- <br /> 1.1 QT'S SERVICES tural, mechanical and electrical systems materials and such <br /> 1.1.1 The Architect's services consist of those services per- other elements AS may be aopropriatC. <br /> formed by the Architect, Architect's employees and Archtiteel's 2.3.2 The Architect shall advise the Owner of any adjustments <br /> consultants as enumerated in Articles 2 and 3 of this Agreement to the preliminary estimate of Construction Coca <br /> and ally other services included in Article 12. <br /> 1.1.2 The Architect's services stall be performed as expedi- 2.4 CDNSTRUC?10N DOCUMENTS PHASE <br /> tiously as is cnni1Stcxlt with professional skill and care arlci the <br /> 2.4.1 Based on the approved Design Development Duey- <br /> orderly progress of the Work.Upon request of the Owner,the merits and any further adjustments in the scope ur aptafity of <br /> Architect shall submit for the Owner's approval a schedule for <br /> the Project or in the exeutrtmcnt1 In tJtct authorpeet by the <br /> the performance of the Arclds.and s services which may has Owner,the Architect stall prepare,for approval by the Owner. <br /> adjusted d the Project proceeds,aril shall include allowances Construction Dsocu ente consisting of Orewings and SpcCifice. <br /> for periods of time required fie the Owner's review and for lion setting forth in detail the requirements for the ConStruc- <br /> approval of submissions by authorities having jurisdiction over lion of the Project. <br /> the Project, Time limits established by this schedule approved <br /> by the Owner'shall nix,exceje for reasonable CIUSe,he Lv tUCd 2.4.2 The Architect shell assist the Owner in the preparation of <br /> by the Architect or Owner. the neceeary bidding information. bidding forms, the Condi- <br /> tions of the Contract,and the form of Agreement between the <br /> 1.1.3 The services covered try this Agreement are subject ro Owner and Contractor. <br /> the rime limitations contained in Stihpurlgraph 11.5.1. <br /> 2.4.3 The Architect shall advise the Owner of any adjustments <br /> .E 2 to previous pl'eliminery estimates of Construction Cost indi- <br /> cated by changes in requirements or general market conditions, <br /> SCOPE OF ARCHITECT'S BASIC SERVICES 2.4.4 The Architect shalt arse the Owner its Connection with <br /> 2.1 DEFIM,nON the Owner's responsibility for filing documents trquircci for <br /> the approval of goverraneetel authorities having jurisdiction <br /> 2.1.1 The Architect's Basic Services consist of t dse described over the Project. <br /> in Paragraphs 2.2 through 2.6 and any other services identified <br /> in Article 12 as part of Basic 5crviCv,and inchtde normal stele- 2.5 RDDING OR NEGOTIATION PHASE <br /> turd, ntechenical and ciertrical engineering services. <br /> 2.5.1 The Architect, following the Owner's approval of the <br /> 2.2 SCHEMATIC DESIGN PHASE Construction Docurneres and of the latest preiimirnary estimate <br /> 2.2.1 The Architect shall review the program ibrntshed by the of C'nnstnJCtirar' Cost,shall assist the Owner in tnhtainirhg bids <br /> Owner to ascertain the requirements of the Project and shall <br /> or negotiated proposals and assist in awarding and preparing <br /> arrive at a mutual tnale•r landing Of SUCtI requirements with the contracts for construction. <br /> Owner- 2.6 CONSTiNJCTIOitI PHASE—ADMINISTRATION <br /> 2.23 The Architect shall provide a preiirttionary evaluation of OF THE Qp1 RUCTION CONTRACT <br /> the owner's program, scitedtile and construction budget <br /> requirements,each in terms of the other,subject to t c lirnita- 2.6.1 The Architect's responsibility to provide Basic Services <br /> tions set forth in Subparagraph 51-1- for the Construction Phase under this Agtocmcrtt commences' <br /> with the award of the Contract for Construction and terminates <br /> 2.2.3 The Architect shall review with the Owner *emotive at the earlier of the issuance to the Owner at'the final Certificate <br /> approaches to design and construction of the Pr+ojcct. for Payment or 60 days after the date of Substantial Completion <br /> 23.4 Based on the Mutually agreed-upon progrartl, Schedule of the Work,unless extended under the terms of Subparagraph <br /> and construction budget requirements, the Architect shall 10.3.3. <br /> prepare, for approval by the Owner, Schematic Designn.Doco- 2.6.2 The Architect shall provide edministratirrf of the Con- <br /> rments consisting of drawings and other documents illustrating tract for Construction as set forth below and In the edltican of <br /> the scale and relationship of Project components. A1A Document A201, General Conditions of tlx:Contract for <br /> 2.24 The Architect shall submit to the Owner a preliminary Construction, current at of the date of this Agreement,unless <br /> estiunale of Construction Cost based on current area,volume or otherwise provided in this Agreement. <br /> other unit costs. 2.6.3 Duties,responsibilities end limitations of authority caf the <br /> 2.3 DESIGN DEVELOPMENT PHASE Architect shall not be restricted,modified or extended without <br /> written agreement of the Owner and Architect with cogent of <br /> 2.3.i Based on the approved Schematic Design Documents the Contractor, which consent shall not he unreasonably <br /> and any adjustments authorized by the Owner in the program, withheld. <br /> AiA OOCYMERrT 6141 OWNF3t•AACNITECT AGREEMENT•5dx RTtE111'H EDiTlON •AMA* •e19e7 Bi�t•1SB7 <br /> THE AMERICAN IN5TSTUTE OF ARCHITECT.1735 NEW YORK AVENUE.N,W.,WASI tUNGTpty,D.C.20006 <br />