Browse
Search
Agenda - 06-29-1993 - VII-C
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 06-29-1993
>
Agenda - 06-29-1993 - VII-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 1:44:00 PM
Creation date
1/23/2017 12:15:39 PM
Metadata
Fields
Template:
BOCC
Date
6/29/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VII-C
Document Relationships
Minutes - 19930629
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> connector. In recent DCHC discussions, DOT has <br /> proposed the provision of paved shoulders four feet <br /> wide along the 70 connector. <br /> Additional comment on this issue has been solicited by <br /> Planning staff. The NCDOT Bicycle Program has been <br /> asked to review the adequacy of the proposed paved <br /> shoulder along the 70 connector. Their response will <br /> be reported at the meeting unless documentation is <br /> received in time for inclusion in the agenda. The <br /> Bicycle Plan consultant has also been contacted about <br /> the advisability of some type of barrier to separate <br /> cyclists from traffic along the 70 connector. The <br /> consultant does not recommend physical separation of <br /> bicycles and automobiles in such a setting unless <br /> traffic speeds are 55 MPH or greater. Finally, the <br /> Town of Hillsborough has been contacted regarding this <br /> issue. They may be considering it further, but it is <br /> not known presently if this will take place before <br /> June 29. <br /> RECOMMENDATION: Discussion on this report could result in the Board of <br /> County Commissioners pursuing further communication <br /> with DOT based on the following: <br /> 1) NCDOT Bicycle Program or the Bicycle Plan <br /> consultant determination that the DOT proposed <br /> shoulder for bicycle access along the Highway 70 <br /> connector is not sufficient; or <br /> 2) If the BOCC wishes to maintain its previous <br /> position on closing of West Ten Road irregardless <br /> of DOT's proposal for bicycle connector. <br /> DK15:WTEN6-29 .DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.