Browse
Search
Agenda - 06-12-2007-4dd
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-12-2007
>
Agenda - 06-12-2007-4dd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:57:44 PM
Creation date
8/28/2008 11:56:18 AM
Metadata
Fields
Template:
BOCC
Date
6/12/2007
Document Type
Agenda
Agenda Item
4dd
Document Relationships
Minutes - 20070612
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
RES-2007-042 Orange County's Priority Transportation Projects 2009-1015 Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 3 <br />2007-2013 TIP PRIORITY LIST STATUS <br />ORANGE COUNTY TRANSPORTATION PRIORITY LIST WITHIN <br />THE DURHAM-CHAPEL HILL-CARRBORO <br />METROPOLITAN AREA BOUNDARY <br />FOR CONSIDERATION OF FUNDING IN <br />THE 2007 - 2013 TRANSPORTATION IMPROVEMENT PROGRAM <br />1. SR 1006, Orange Grove Road, at Interstate 40: Construct a pedestrian bridge over I- <br />40. New Grady Brown Elementary and newly constructed Cedar Ridge Nigh School <br />are located on New Grady Brown School Road that has access from .Orange Grove <br />Road south of I-40. The schools are within walking and cycling distance from <br />residential areas north of I-40. Bicyclists and pedestrian must share the roadway <br />with motor vehicles crossing the narrow two-lane bridge that carries Orange Grove <br />Road aver Interstate 40. The bridge is too narrow to accommodate a pedestrian <br />walkway. Lack of an adequate pedestrian crossing presents an unsafe environment. <br />for students to walk to the schools. <br />Status in Draft 2007-2013 TIP: scheduled for feasibility study (no year given) <br />2. U-2805, Homestead Road (SR 1777 Improvements: Improve Homestead Road <br />from SR 1834, High School Road, to NC 86. This project should include bicycle and <br />pedestrian facilities. There are three schools in the vicinity of Homestead Road: <br />Chapel Hill High School, Smith Middle School and Seawell Elementary School. <br />Many students live within walking distance and cycling distance to Chapel Hill High <br />School and must walk or cycle along Homestead Road, and cross the road daily. <br />Provision of sidewalks is of utmost importance for the safety of students and other <br />pedestrians who use this corridor. Provision of bicycle facilities is, likewise, <br />necessary for the safety of students and others. <br />This project should also include appropriate safety improvements to the intersection <br />of Homestead Road with High School Road. <br />Status in Draft 2007-2013 TIP: Intersection improvements (turn lanes, traffic signal, <br />crosswalks) and bicycle lane and sidewalk on the north side of Homestead Road <br />and 4' paved shoulder on south side from High School Road to Rogers Road are <br />being constructed with Moving Ahead money. The intersection improvements and <br />bicycle lane, 4' paved shoulder, and sidewalk from High School Road to Camden <br />Lane have been completed. Remainder of project remains unfunded. <br />3. R-2825, Improvements to South Churton Street: Develop congestion management, <br />limited access, aesthetic and capacity improvements between US 70 Business and <br />Interstate 40. The portion between Interstates 40 and 85 will conform to the design <br />criteria of the Economic Development District Design Manual (4-lane divided section <br />with bike and pedestrian improvements). The feasibility study completed in <br />February 2002 recommends a 4-lane divided, with 16-foot median, curb and gutter <br />cross section for the entire corridor from 1-40 to Eno River. Orange County stresses <br />the need to study improvements within the current right-of-way for the segment north <br />C:;'C'ransp;xtathn4T'I P+l. tstiv-15T iF° ~J'rirrityt. i5«~Cn~'r-~ SPrhrftg!. ~s;Sta<i;:: ;f~ a: <br />
The URL can be used to link to this page
Your browser does not support the video tag.