Browse
Search
Agenda - 01-24-2017 - 6-g - Unified Development Ordinance (UDO) Text Amendments - Subdivision Regulations and Processes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 01-24-2017 - Regular Mtg.
>
Agenda - 01-24-2017 - 6-g - Unified Development Ordinance (UDO) Text Amendments - Subdivision Regulations and Processes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 3:40:44 PM
Creation date
1/20/2017 11:26:06 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6g
Document Relationships
Minutes 01-24-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 3: Base Zoning Districts 30 <br /> Section 3.3: Residential Districts <br /> AR DISTRICT SPECIFIC DEVELOPMENT STANDARDS <br /> 1. Uses shall be restricted to those indicated for the AR District in Section 5.2, unless a Conditional Use(CU) <br /> or MPD-CZ District is approved (see Section 3.8). <br /> 2. Development within the zoning district shall be subject to all applicable use standards detailed in Article 5 <br /> and all applicable development standards detailed in Article 6 of this Ordinance. <br /> 3. While the Minimum Lot Size may be 40,000 square feet, the density permitted on a given parcel is based on <br /> the Watershed Protection Overlay District in which the property is located. Refer to Section 4.2.4 for a <br /> breakdown of the allowable density(i.e., the number of individual dwellings that can be developed on a <br /> parcel of property). <br /> 4. Allowable impervious surface area is based on the Watershed Protection Overlay District in which the <br /> property is located. Refer to Section 4.2.5 for a breakdown of the allowable impervious surface area. <br /> 5. For lots outside of a Watershed Protection Overlay District(see Section 4.2), the minimum usable lot area <br /> for lots that utilize ground absorption wastewater systems shall be 30,000 square feet for parcels between <br /> 40,000 square feet and 1.99 acres in size; zoning lots two acres and greater in size shall have a minimum <br /> usable lot area of at least 40,000 square feet-. For Subdivisions utilizing the Flexible Development Option, <br /> the required wastewater system area may be contained either within the residential lot or within dedicated <br /> easement and/or septic lot that is recorded and maintained within allowed open space areas, and as further <br /> defined in NC DHHS DPH Innovative Waste Water System Approval IWWS 2016-01. Under the Flexible <br /> Development Option required minimum lot size shall be based on proposed wastewater disposal and <br /> percentage of open space. Please refer to Section 7.12 for more information.8 <br /> 6. With the exception of Orange County government development projects,wastewater treatment facilities with <br /> a design capacity of 3,000 gallons per day or more and package treatment plants for sanitary sewage <br /> disposal are prohibited in the AR zoning district unless approved through the Special Use Permit(SUP) <br /> process or as a Conditional Use(CU) District. <br /> 7. Proposed subdivisions are subject to all applicable subdivision standards detailed in Article 7. Note that <br /> Article 7 provides for different dimensional requirements than those shown in the Dimensional and Ratio <br /> Standards table depending upon the type of subdivision proposed and the percentage of open space <br /> provided. <br /> 8. Subdivisions utilizing,following the conventional design process and/or-proposing private roads are subject <br /> to larger setbacks and minimum lot sizes than those listed in the Dimensional and Ratio Standards. Refer to <br /> Section 7.8.4 for additional requirements. Refer to Section 7.8.5 for private road standards. <br /> 9. The storage of junked or wrecked motor vehicles is prohibited except if the vehicle is stored in an enclosed <br /> building that conforms to applicable building code and zoning regulations or if such building is a legal non- <br /> conforming use. <br /> 8 Under the proposed amendments to the Flexible Development—Option lot sizes can be reduced below 40,000 <br /> sq.ft.of land area. Staff is revising existing language to ensure consistency. <br /> Orange County, North Carolina—Unified Development Ordinance Page 3-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.