Browse
Search
Agenda - 01-24-2017 - 6-g - Unified Development Ordinance (UDO) Text Amendments - Subdivision Regulations and Processes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 01-24-2017 - Regular Mtg.
>
Agenda - 01-24-2017 - 6-g - Unified Development Ordinance (UDO) Text Amendments - Subdivision Regulations and Processes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 3:40:44 PM
Creation date
1/20/2017 11:26:06 AM
Metadata
Fields
Template:
BOCC
Date
1/24/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6g
Document Relationships
Minutes 01-24-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 2: Procedures 25 <br /> Section 2.14: Minor Subdivisions <br /> (c) Declaration of Restrictions <br /> (d) Homeowners/Property Owners'Association documents, if required <br /> (6) If the approved plat is not recorded within the specified time period, the plat is <br /> void. <br /> (7) Any plat or portion thereof not receiving final plat approval within the time period <br /> set forth in (5) above shall be null and void except under the following conditions: <br /> (a) The subdivision is built in sections or phases, and a phasing plan was <br /> approved as part of the Preliminary Plat; <br /> (b) The period between the approval date of the Preliminary Plat and the <br /> approval date of the Final Plat for the first phase does not exceed one <br /> year; and <br /> (c) The period between the approval date of the Final Plat of the first <br /> phase and the approval date(s) of the Final Plat(s) of any subsequent <br /> phase(s) does not exceed the time limits specified in the phasing plan <br /> of the Preliminary Plat. If no phasing plan is indicated, then the period <br /> between Final Plat approvals shall not exceed six months. <br /> (8) If a phasing plan for construction of the subdivision is approved, the expiration <br /> date of the Preliminary Plat shall be governed by the time period(s) approved as <br /> part of the phasing plan. <br /> (6}jL The Planning Director may extend the deadline for recordation provided the <br /> applicant can demonstrate a good faith effort to comply with the deadline, but for <br /> reasons beyond his/her control, fails to meet the requirements for recordation <br /> within the specified period. <br /> (7}(10) All final plats shall conform to drawing specifications and certification <br /> requirements for Final Plats contained in Section 7.14.3 of this Ordinance. <br /> 4}(11) Recordation of the approved final plat, and any required auxiliary documentation <br /> shall be with the advice and consent of the Planning Director. <br /> Orange County, North Carolina—Unified Development Ordinance Page 2-48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.