Browse
Search
Agenda - 06-07-1993 - III-F
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 06-07-1993
>
Agenda - 06-07-1993 - III-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 10:10:40 AM
Creation date
1/19/2017 4:03:50 PM
Metadata
Fields
Template:
BOCC
Date
6/7/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
III-F
Document Relationships
Minutes - 19930607
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The remaining application fee shall be paid in the amount of $198.00 <br /> ($375.00 - $177.00). <br /> F. Certifications <br /> 1. A Certificate of Survey and Accuracy signed by a registered Land Surveyor <br /> shall be notarized on the face of the Final Plat. <br /> 2. A Certificate of Declaration and Maintenance in the form provided in Section <br /> V-D-6-b of the Orange County Subdivision Regulations signed by the <br /> landowner and developer shall be on the face of the plat and included in a <br /> document describing development restrictions to be recorded concurrently with <br /> the Final Plat. <br /> 3. The Department of Environmental Health shall certify that each lot contains a <br /> suitable area for septic disposal or has access to an approved easement. <br /> 4. The North Carolina Department of Transportation shall certify that Everett <br /> Lane has been constructed to State standards or that construction plans have <br /> been-appfevee1 <br /> 4. A Certificate of Approval signed by the Orange County Planning and <br /> Inspections Department. <br /> ) <br /> 7 Signature of Applicant Clerk topv/tfie Board <br /> I, /h 0A,r J /74(,:r , accept the above listed conditions of subdivision approval, <br /> and acknowledge that each must be met prior to recordation of the final plat. . <br /> y6 <br /> Applicant Date <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.