Orange County NC Website
<br />~ Evaluation of the existing hot water and chilled water piping to determine to what extent <br />replacement is necessary. <br />® Evaluation of duct systems to deterini.ne where and to ~~vhat extent ductwork can be <br />feasibly replaced. <br />® Evaluation of the phasing and relocation of occupants that may Ue required as a .result of <br />ductwork and system replacement. <br />® Evaluation of the existing boiler systems (2) to determine if systems should be combined <br />and how they should be replaced rvithiiz the project budget and phasing. <br />® Evaluation of ventilation systems to determine what is necessary and. feasible within.the <br />project budget to meet code requirements. <br />~ Evaluation of smoke exhaust systems (if present and if required by code) to determine <br />what is necessary to meet code requirements. <br />® Evaluation in cooperation with the county inspections department of other building <br />systems which they iiiight require to be upgraded (lire ratings, egress, fire alaixns, <br />security, etc.). ' <br />