Browse
Search
Agenda - 06-12-2007-4aa
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-12-2007
>
Agenda - 06-12-2007-4aa
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 7:07:48 PM
Creation date
8/28/2008 11:55:13 AM
Metadata
Fields
Template:
BOCC
Date
6/12/2007
Document Type
Agenda
Agenda Item
4aa
Document Relationships
Minutes - 20070612
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a~ <br />2. Construction administration services which extend beyond the established Contract Completion <br />Date, through no fault of the Designer, including default ofany Contractor. <br />3. Modifying drawings and specifications as a result of Contractors' equipment substitutions, failure <br />to coordinate or sequence the work, or other fault of the Contractor(s). <br />4. Any other services requested that are not listed in Basic Services above. <br />BILLINGS/PAYMENTS: Invoices will be presented monthly, based on progress during the month. <br />Payments wilt be due on a net 30-day basis. Financing charges on balance beyond 30 days wilt be 1-I/2% <br />per month (I $% APR). If we should have to seek legal action to effect collection, and we prevail in. <br />litigation, then all costs associated with collecting overdue accounts will. be recoverable. if payments are <br />withheld or disputed, then we retain the right to suspend further services until the account is current. <br />MISCELLANEOUS PROVISIONS: <br />1. If there is a project sign and/or building plaque, then Reece, Noland, & McElrath will be <br />appropriately listed. <br />2. Reimbursable expenses for preparation and shipment of bidding documents for Contractors only <br />will be billed to the Owner at a multiplier of 1.1 times direct expense. All other expenses <br />associated in production of the project are included in the lump sum fee.. <br />Submitted by: Accepted by: <br />REECE, NOLAND & McELRATH, ING. <br />Step en C. Kaufman, PE <br />Date Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.