Orange County NC Website
EXHIBIT A <br /> Project Specifications for Sewer Line Easement Clearing <br /> In addition to mowing the ground cover, the Contractor will remove any limbs or <br /> other vegetative growth that projects into the easement area, up to a height of 10 feet. <br /> There may also be trees or limbs that have fallen across the easement. These will <br /> need to be cut to the limits described and either hauled away or chipped in the <br /> field as described above. <br /> There are some manholes that are enclosed within fenced-in yards or may <br /> otherwise be inaccessible, due to structures built by property owners around the <br /> easements. To the greatest extent possible, the Orange County Engineering staff <br /> will advise the Contractor of any known structures that might impede clearing before <br /> work begins. However, if the Contractor comes across an area that would require <br /> destruction of such fences or other structures in order to clear the easement, the <br /> Contractor should contact Orange County Engineering Staff for guidance, prior to <br /> taking any further action. <br /> Exclusions <br /> 1. The grounds within the fence lines of the Richmond Hills Pump Station and the <br /> Brookhollow Pump Station. <br /> Schedule <br /> Once notified to begin work, please note that time is of the essence. Work on <br /> this project should commence as soon as possible and continue without interruption <br /> until the project is completed. Should there be delays, for whatever reason, the work <br /> shall be completed no later than the termination date of contract. <br /> SA12_Engineering\Efland Sewer\Contracts\Easement Clearing\FY2016-2017\SewerLineEsmtClearingSpecifications_2016.docx <br /> Specifications Page 2 of 2 <br />