Orange County NC Website
DocuSign Envelope ID: D0D4336D-BBE2-4675-B7DF-226F5C0932F0 <br /> 1. Inclusive of Equipment travel (Tractor, UTV, Plow-Mounted <br /> Vehicles) <br /> 2. Exclusive of Salt Spreading <br /> 3. Exclusive of manpower traveling, non-equipment <br /> iii. Up To 4" Snow: Hourly Rate of$125/hour per equipment used on-site <br /> iv. 4" to 8.9" Snow: Hourly Rate of$135/hour per equipment used on-site <br /> v. 9" to 13.9" Snow: Hourly Rate of$150/hour per equipment used on-site <br /> vi. 14" and greater: Hourly Rate $150/hour+ $20 every 4-inches of snow <br /> per equipment used on-site <br /> vii. Photographic evidence of snow depth to be taken and emailed, prior <br /> to work beginning. <br /> viii. Pre-Treatment Surface Area: <br /> 1. .90 cents/pound salt/ice-snow melt for initial treatment <br /> 2. .75 cents/pound salt/ice-snow melt post-event treatment and each <br /> recurrent application <br /> 3. Inclusive of walkways, access doors, and complete parking lot <br /> coverage <br /> 4. Application may begin 48-hrs before event and up to time of event <br /> ix. Side Walk Snow Removal: <br /> 1. 1"to 6" Snow: Hourly Rate $65/hour <br /> 2. 7"to 12" Snow: Hourly Rate $115/hour <br /> 3. 13"to 16" Snow: Hourly Rate $130/hour <br /> 4. > 17" Snow: Hourly Rate $150/Hour+$20/Hour for every 4" <br /> increment of snow, not to exceed$150/hour <br /> x. Fuel/Gas Supply: During event, when mobilization of resources is active, <br /> Orange County to support resources with fuel/gas and or nourishment as <br /> needed,to facilitate increased work-productivity. Fuel/Gas supply may be <br /> through mobile re-fuel or designated site source <br /> Authorized Signature: <br /> Authorized by(Printed Name &Title): <br />