Browse
Search
Agenda - 05-03-1993 - VIII-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 05-03-1993
>
Agenda - 05-03-1993 - VIII-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 9:40:41 AM
Creation date
1/17/2017 3:59:02 PM
Metadata
Fields
Template:
BOCC
Date
5/3/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50 <br /> If a plan is approved subject to conditions, no zoning permit <br /> or subsequent building permit shall be issued until all <br /> conditions of approval have been met to the satisfaction of <br /> Orange County. <br /> Site plan approval and the issuance of a zoning compliance <br /> permit does not establish a vested right to develop the <br /> property should zoning regulations change subsequent to plan <br /> approval. <br /> At the option of the Applicant, a Site Plan may be vested for a <br /> period of not less than two (2) nor more than five (5) years . <br /> To become vested, a Site Plan must be approved by the Board of <br /> County Commissioners as a Special Use Permit, pursuant to <br /> Article 8 of this Ordinance. An approved Site Specific <br /> Development Plan shall contain the following statement: <br /> "Approval of this plan establishes a zoning vested right under <br /> G.S. 153A-344 . 1. Unless terminated at an earlier date, the <br /> zoning right shall be valid until <br /> 21.4 Zoning Compliance Permit Required <br /> It shall be unlawful to begin the excavation for the <br /> construction, the moving, alteration, or repair, except <br /> ordinary repairs, of any building or other structure, including <br /> an accessory structure costing more than $100 or exceeding one <br /> hundred square feet in area, until the Zoning Officer has <br /> issued for such work a Zoning Compliance Permit which includes <br /> a determination that plans, specifications and the intended use <br /> of such structure does in all respects, conform to the <br /> provisions of this ordinance. <br /> Also, it shall be unlawful to change the type of use or type of <br /> occupancy of any building, or to extend any use of any lot on <br /> which there is a non-conforming use, until the Zoning Officer <br /> has issued for such intended use a Zoning Compliance Permit, <br /> including a determination that the proposed use does, in all <br /> respects, conform to the provisions of this ordinance. <br /> Issuance of a Zoning Compliance Permit does not establish a <br /> vested right to begin and complete construction or change the <br /> use/occupancy of a lot or building should zoning regulations <br /> change subsequent to issuance of said permit. <br /> Ordinance Review Committee: <br /> Planning Board: <br /> BOCC: <br />
The URL can be used to link to this page
Your browser does not support the video tag.