Orange County NC Website
<br />general retail uses that are more compatible for <br />use of individual septic and well systems for <br />utility provision. <br />As outlined under the P-ROS, section mixed use <br />development projects are possible within this <br />zone subject to project approval through the <br />Conditional Use permitting and review process at <br />such time residential land uses are made <br />operative by land use and zoning amendments. <br />IMPERVIOUS SURFACE AREA - BUCKHORN DISTRICT: <br />The total amount of impervious surface covered by buildings <br />and parking lots is limited to 70% of a building site. As <br />shown on the schematic plan, stormwater control for multiple <br />sites may be provided through construction of several <br />detention basins, located along individual streams draining <br />the district, particularly an the north side of the interstate (as <br />shown on the schematic plan). Alternatively, a larger, single <br />detention basin could be constructed on the south side of 1- <br />85 at or below the confluence of the streams. Detention <br />basins may also be constructed on individual sites. <br />Impervious surface limits and standards for detention basin <br />construction and ~ maintenance are discussed further in <br />Section 2.3 -Land Intensity and Appendix C -Wet Detention <br />Basin Standards, respectively. <br />6 <br />