Browse
Search
2017-004-E SW - CST Fleet Services for Fleet Management Study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-004-E SW - CST Fleet Services for Fleet Management Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2019 3:01:17 PM
Creation date
1/11/2017 1:56:27 PM
Metadata
Fields
Template:
Contract
Date
12/14/2016
Contract Starting Date
1/5/2017
Contract Document Type
Agreement - Consulting
Amount
$20,000.00
Document Relationships
R 2017-004-E SW - CST Fleet Services for Fleet Management Study
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: F3FC9CBB-0A47-4FED-AB10-0917A762CF64 <br /> 13 1 Ewa <br /> Fleet Services FLEET MANAGEMENT STUDY t . <br /> ii is __ ii is __ ii <br /> PROJECT PLAN AND TIMELINE <br /> Our goal is to prepare and schedule a 2-day long data gathering, site visit and interview trip. This is reflected in <br /> the attached schedule and project plan. Actual dates will be defined once an agreement is in place and will <br /> reflect the availability of both CST and Orange County's Solid Waste staffs. <br /> CST-Orange County Solid Waste Fleet Review Week 1 Week 2 IWeek 3 IWeek 4 IWeek 5 IWeek 6 <br /> Kick Off Meeting and Project Planning <br /> Conference Call to Kick Off Project <br /> Schedule On Site Week <br /> Data Gathering and On Site Observations(2 Days) <br /> Collect Data Nedded from FMS(TMT) <br /> Review Current Replacement and Capital Plan <br /> Review Best Practice Matrix <br /> Review Shop Operations <br /> Determine Jobs and Gather Data for Benchmarking <br /> Data Analysis and Model Completion <br /> Complete Best Practice Matrix <br /> Build Models for Age,Utilization,Life Cycle and Capital Plan <br /> Perform Benchmarking Analysis <br /> Complete Recommendations,Risks and Benefits <br /> Write and Deliver Initial Draft <br /> Get Feedback from Solid Waste Staff <br /> Complete Final Report <br /> Complete and Deliver Draft of Final Report <br /> Review Final Report with Orange County Solid Waste <br /> Make Changes Identified in Review <br /> Deliver Final Report <br /> With the above aggressive timeline,we are assuming that Solid Waste/the County will assign a <br /> liaison for CST to schedule a fairly tight schedule for the 2nd week of the project. <br /> CST Fleet Services Proposal 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.