Browse
Search
Agenda - 05-21-2007-c4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 05-21-2007
>
Agenda - 05-21-2007-c4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 9:24:56 AM
Creation date
8/28/2008 11:52:39 AM
Metadata
Fields
Template:
BOCC
Date
5/21/2007
Document Type
Agenda
Agenda Item
c4
Document Relationships
Minutes - 20070521
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County SE & SC Ordinance September ! r. ,nn3September 12.20 ) <br />runoff is retained on the site before being released. The purpose of this requirement is to <br />insure that, not only will the standard set forth in subsection 9A. be met, but also a <br />mechanism will be provided to safeguard the watershed against the spillage of toxic or <br />dangerous substances. <br />SECTION 9 STORMWATER OUTLET PROTECTION <br />A. Control of Discharge in University Lake, Cane Creek, and Upper Eno <br />Watersheds <br />Provisions shall be made for the control of stormwater discharges for the types of <br />development as specified below. After development of the site, the peak discharge of <br />stormwater runoff resulting from a ten -year storm shall be no greater than that which <br />would result from a ten -year storm on the same site prior to development. <br />This requirement shall apply to: <br />• Commercial, industrial, office, and institutional developments <br />• Multi - family residential developments of more than 10 units <br />• Single - family detached residential developments where more than 3 lots are to be <br />created. <br />B. Control of Velocity <br />Persons shall plan and conduct land- disturbing activity so that the post - construction <br />velocity of the 10 -year storm runoff in the receiving watercourse to the discharge point <br />does not exceed the greater of: <br />® The velocity established by the table in paragraph 3 of the subsection; or <br />• The velocity of the 10 -year storm runoff in the receiving watercourse prior to <br />development. <br />If conditions (1) or (2) of this paragraph cannot be met, then the receiving watercourse to <br />and including the discharge point shall be designed and constructed to withstand the <br />expected velocity anywhere the velocity exceeds the "prior to development" velocity by <br />10 %. <br />C. Standards <br />1. Acceptable Management Measures <br />Measures applied alone or in combination to satisfy the intent of this subchapter <br />are acceptable if there are no objectionable secondary consequences. Innovative <br />techniques and ideas will be considered and may be used when shown to have the <br />potential to produce successful results. Some alternatives are to: <br />W1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.