Orange County NC Website
NC Highway 57 Speedway Area Small Area Plan <br />Policy. The County shall develop a comprehensive design manual outlining the <br />acceptable methods of street construction and maintenance for all public and private <br />streets within the Study Area. This manual shall include standards for parking lot layout, <br />parking stall orientation and design, and developing curb cuts onto local roadways, <br />Policy. All future non - residential developments within the Study Area shall utilize <br />shared driveway cuts, reciprocal easements between separate parking lots, and service <br />roads to channel access from major thoroughfares to each property. <br />Standards. Included below is a graphical example of this proposal: <br />NC Highway 57 <br />Policy. These access management options shall be referenced within the parking lot <br />design standards of the Zoning Ordinance. <br />Policy. Parking lot design standards of the Zoning Ordinance shall establish distance <br />requirements to ensure a set distance between individual curb cuts for all development to <br />avoid unnecessary congestion along major roadways within the Study Area. <br />Objective 9 -5. Parking lot design standards of the Zoning Ordinance shall establish a set <br />minimum distance from curb cuts to property lines and a minimum set distance from each <br />other on separate properties. <br />Policy. Joint access is encouraged. <br />Objective 9 -6. Cable and high -speed Internet lines, and emergency services shall be <br />available to residents within the Study Area within five (5) years of the adoption of the <br />Small Area Plan. <br />Policy. The County shall continue to extend services and infrastructure, such as cable <br />and high -speed Internet lines, and emergency services, to local residents and property <br />owners. <br />Objective 9 -7. When a reservoir is developed on the Hanson Aggregate stone quarry <br />property according to the approved end use plan, at least forty percent (40 %)of the <br />ultimate volume of raw water stored in the quarry reservoir shall be allocated to Orange <br />County as a source of drinking water. <br />Wo <br />