Browse
Search
Agenda - 05-21-2007-c2
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 05-21-2007
>
Agenda - 05-21-2007-c2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 9:21:25 AM
Creation date
8/28/2008 11:51:52 AM
Metadata
Fields
Template:
BOCC
Date
5/21/2007
Document Type
Agenda
Agenda Item
c2
Document Relationships
Minutes - 20070521
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NC Highway 57 Speedway Area Small Area Plan <br />There are two types of subdivisions: major and minor. Minor Subdivisions are divisions of land <br />resulting in the creation of two to five lots, and are generally reviewed at the staff level. Major <br />Subdivisions are those divisions of land proposing to create more than five lots; those are <br />reviewed for technical matters by staff and through a development review and approval process <br />that includes the Planning Board and BOCC. <br />All subdivisions have to make provisions for road construction as well as designating a minimum <br />road right -of -way. Although the County has private road construction standards that are less <br />restrictive than the North Carolina Department of Transportation (NCDOT) standards, the right - <br />of -way requirements are the same. <br />As areas within the County continue to develop, the need to encourage the interconnectivity of <br />individual roadways becomes more and more important to allow for the free flow of traffic and <br />to create a unified traffic pattern. The availability of alternate routes, and interconnected side <br />streets, throughout an area provides for some disbursement of traffic and alleviates some of the <br />traffic load off the highways serving larger areas of the County. Prior understanding of this <br />network of roads and planning for this at the subdivision level can be a powerful tool in <br />proactively addressing transportation problems of the future. <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.