Orange County NC Website
Chapter 3: Implementation <br />1. 'Re -write Zoning Ordinance "Medium <br />© Access management along Cornelius Street "Medium <br />»® Neighborhood scale mixed use zoning district "Medium <br />® 'Revise parking requirements for commercial, office, and institutional "Medium <br />uses <br />® Streamlined review processes to encourage development along the "Medium <br />corridor <br />® "Establish requirements for integrating CPTED strategies while still "Medium <br />protecting residential rivacy <br />a ® ".Traffic calming menu of options for development "Medium <br />® Standards for bike rack and pedestrian bench installation at commercial <br />Medium <br />and multi - family developments <br />® 'Pedestrian connectivity requirements "Medium <br />„® Signage consistent with Churton Street Plan recommendations .Medium <br />® -Pedestrian walkway options other than concrete sidewalks <br />"Medium <br />r!4... Engage the: Town Board and staff <br />Immediate <br />® Continue to request the widening of Cornelius/US 70 as part of the TIP <br />Immediate <br />funding cycle <br />® Assess feasibility and prepare cost estimates for local street network <br />Short <br />changes <br />„e ".Make sure land use recommendations in Strategic- Growth,'Plan that are <br />"Immediate <br />consistent with this plan <br />m® Develop funding schedule for public improvements in the corridor and <br />Immediate <br />submit to "Town.Board for prioritization (lighting on existing poles, new <br />lighting, banners, welcome sign) <br />® -Request tree plantings from,Tree'Board in advance of widening that will <br />Immediate <br />be able to remain when widening complete <br />>® ::Request NCDOT to improve directional signage along the 70, Corridor <br />Short <br />>® "Include this corridor in wayfinding signage study and investment <br />Short <br />Encourage bus stop locations along US 70 for both local circulation and <br />Short <br />regional commuting <br />Request local funding to implement local street network changes <br />".Medium <br />»® , Develop funding schedule for bike/ p edestrian pathways <br />".Medium <br />® Initiatd''Phase 2 of the' US 70% Cornelius Street Corridor Task'Force with <br />Long <br />the mission of developing plans for the eastern portion of the, Corridor <br />within town limits <br />47 <br />US 70/ Cornelius Street Corridor Strategic Plan 2007 <br />