Browse
Search
Agenda - 05-21-2007-c1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 05-21-2007
>
Agenda - 05-21-2007-c1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 9:20:12 AM
Creation date
8/28/2008 11:51:14 AM
Metadata
Fields
Template:
BOCC
Date
5/21/2007
Document Type
Agenda
Agenda Item
c1
Document Relationships
Minutes - 20070521
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter 1: Plan Development <br />11Ejd oing!Conditions <br />rlTlie, Corridor <br />US 70 is a state - maintained highway that connects Asheville in western North Carolina to the Outer Banks in <br />the east and which predates the state interstate system. Regionally, US 70 carries commuter and truck traffic <br />between the cities comprising the Triad; Greensboro; Winston Salem, and ,High Point, and the cities of the <br />- Triangle; Raleigh, Durham, and Chapel. Hill. Locally, the road serves commuters traveling east and west from <br />"Mebane, Efland, and Hillsborough. In fact, it is one of the main east -west connectors in town. The US 70/ <br />Cornelius Street Corridor encompasses a stretch of road, 1.2 miles long, with an eastern boundary of NC 86 and <br />a western boundary of Lakeshore Drive:rResidential and commercial zoned properties adjacent to this stretch of <br />road are considered within the 70 Corridor. <br />Currently, the US 70 /Cornelius Street Corridor carries over 8400 vehicles per day according to traffic counts <br />conducted by the NCDOT in 2004. There are no sidewalks or bike lanes along the corridor.. However, there is <br />a 100 -foot right -of -way for the state road, which allows for future road widening and improvements.: The speed <br />limit on this section of highway is 45 mph and there is one stoplight located at the intersection of US 70 and <br />Faucette'. Mill - Road.1'There are many curb cuts along the route due to the numerous commercial businesses and <br />residential driveways that exit onto US 70, as well as 12 side roads that intersect with this section of US 70. <br />The western portion, of US 70, covered in this study, is also a designated truck route and was designed to <br />purposefully divert truck traffic away from downtown Hillsborough. <br />Currently, there are 12 businesses located in the 70 Corridor including a laundromat, ABC store, barbershop, <br />convenience store, and motel., The businesses tend to be service - oriented and serve the neighboring <br />communities of Fairview and Hillsborough Heights. ,,There are over 30 commercially zoned properties, 12 of <br />which are vacant. -There are 21 vacant parcels in the corridor. <br />"There is a residential element of the 70 Corridor as well...-Residential neighborhoods border US 70 to the north <br />and south.,- Over 55 dwellings are located along this part of US 70, 32 of which are apartments. '.'There is a lot of <br />pedestrian traffic along and across US 70 from the nearby neighborhoods. <br />4 <br />US 70/ Cornelius Street Corridor Strategic Plan 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.