Browse
Search
Agenda - 03-23-1993 - III-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 03-23-1993
>
Agenda - 03-23-1993 - III-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 2:59:11 PM
Creation date
1/4/2017 2:52:50 PM
Metadata
Fields
Template:
BOCC
Date
3/23/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
III-B
Document Relationships
Minutes - 19930323
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPANY NAME: Orange County Page 5 <br /> PROJECT NAME: New County Courthouse <br /> LOCATION: Hillsborough, North Carolina <br /> Phase #13 : Receipt and Tabulation of Bids <br /> On the pre-established time, date and place, the <br /> Project Manager shall assist the Owner's representative <br /> in receiving, opening, and tabulating the contractors ' <br /> bids. <br /> A careful review of each bid shall be performed to <br /> verify the completeness, and extent of each bid as <br /> required by the bid package. The bids shall be <br /> tabulated to determine the apparent low bidder. <br /> Phase #14 : Contract Administration <br /> Upon confirming the bids to be in strict compliance <br /> with the bid documents and project requirements, a <br /> recommendation for award shall be made to the Owner. <br /> After receiving approval by the Owner, the Contract <br /> Documents shall be prepared by the Project Manager, in <br /> triplicate, to be executed by the Contractor and then <br /> the. Owner. <br /> During the Contract execution process, a Letter of <br /> Intent shall be issued to the Contractor (with Owner's <br /> authorization) , so that the Contractor can proceed with <br /> his scheduling. <br /> Once all three copies of the Contract have been <br /> executed, the Owner, the Contractor and RTD Associates <br /> will maintain a copy for their record. <br /> PROJECT MANAGEMENT SERVICES <br /> Phase #15 : Pre-Construction Conference <br /> On the pre-established time, date and place, the Pre- <br /> Construction Conference shall be conducted by the <br /> Project Manager. During this meeting, the full scope <br /> of work shall be reviewed by all parties present. <br /> Other pertinent project requirements shall be discussed <br /> and agreed upon such as : staging areas, schedules, pay <br /> requests, communication channels, use of facilities, <br /> submittals, etc. <br /> Minutes of this meeting shall be recorded and will <br /> become an integral part of the Project Manual . <br /> RTD Roof Engineering Technology <br /> Diagnostics and Design <br /> 5500 Executive Center Dr..Suite 117 <br /> Associates.PA. Charlotte,NC 28212 704.596.3322 <br />
The URL can be used to link to this page
Your browser does not support the video tag.