Browse
Search
Agenda - 03-23-1993 - III-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 03-23-1993
>
Agenda - 03-23-1993 - III-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 2:59:11 PM
Creation date
1/4/2017 2:52:50 PM
Metadata
Fields
Template:
BOCC
Date
3/23/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
III-B
Document Relationships
Minutes - 19930323
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMPANY NAME: Orange County Page 3 <br /> PROJECT NAME : New County Courthouse <br /> LOCATION: Hillsborough, North Carolina <br /> Phase # 4 : Performance Criteria Analysis Cont 'd. <br /> This Performance Criteria shall consist of a site visit <br /> to evaluate all conditions which must be considered <br /> during the roof system selection process, in regard to <br /> building and Owner requirements . <br /> Phase # 5 : Roof System Evaluation and Selection <br /> Once the Performance Criteria has been established, <br /> research shall be performed to determine which of the <br /> many systems available have technical capabilities <br /> which are strictly compatible with this criteria. The <br /> significance and importance of this phase is to <br /> properly select the right system, which will provide <br /> our client a successful roof system with maximum <br /> longevity, minimum annual maintenance costs, and <br /> maximum return on investment. <br /> Phase # 6 : (Schematic) Roof Engineering and Design <br /> A preliminary engineering and design shall be performed <br /> to establish the requirements for the various <br /> components of the roofing system, such as membrane, <br /> insulation, attachment procedure, associated details , <br /> etc. , and to organize the content and format of the <br /> technical portion of the design specifications, which <br /> will become an integral part of the Contract Documents . <br /> This technical section dictates the standard of quality <br /> in materials and workmanship. It also outlines the <br /> existing conditions, scope of work, materials to be <br /> used, and <br /> execution of work to be performed. <br /> Phase # 7 : (Schematic) Drawings and Customized Detail Design <br /> Documentation <br /> During the site visit referred to in Phase #4, the <br /> Project Manager will evaluate each and every different <br /> detail requirement such as base flashings, edge <br /> flashing, vent pipes, equipment curbs, etc. , for <br /> customized detail development and illustration. Also, <br /> a comprehensive roof plan will be developed to show <br /> local placement of equipment, drainage dimensions and <br /> other pertinent data for final working drawings <br /> development. <br /> RTD Roof Engineering Technology <br /> Diagnostics and Design <br /> 5500 Executive Center Dr..Suite 117 <br /> Associates.PA. Charlotte,NC 28212 704.506-3322 <br />
The URL can be used to link to this page
Your browser does not support the video tag.