Browse
Search
Agenda - 03-23-1993 - III-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 03-23-1993
>
Agenda - 03-23-1993 - III-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 2:59:11 PM
Creation date
1/4/2017 2:52:50 PM
Metadata
Fields
Template:
BOCC
Date
3/23/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
III-B
Document Relationships
Minutes - 19930323
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roof Engineering Technology <br /> R D Diagnostics and Design <br /> 5500 Executive Center Dr., Suite 117 <br /> Associates, Pal. Charlotte, NC 28212 704-536-3322 ,. <br /> 1"- 2 <br /> February 25, 1993 MAR -3 1 <br /> pin r : . <br /> j <br /> Mr. Wilbert J. McAdoo Re : New County Courthouse <br /> Orange County Hillsborough, NC <br /> P.O. Box 8181 <br /> Hillsborough, NC 27278 <br /> Dear Mr. McAdoo: <br /> As a Professional Engineering firm specializing in the specific <br /> area of Roof Diagnostics, Engineering, Design and Project <br /> Management, we respectfully request your consideration of the <br /> following proposal . <br /> We propose to provide our specialized Roof Engineering expertise as <br /> listed below for the above-referenced project. <br /> ENGINEERING DESIGN AND CONTRACT ADMINISTRATION SERVICES <br /> Phase # 1 : Project Planning and Staffing <br /> A Project Manager shall be selected within our firm to <br /> work closely with the Owner 's representative from <br /> inception to successful completion of the project. <br /> Phase # 2 : Project Requirements Review <br /> A careful and methodical study of the previously <br /> prepared Roof Diagnostic Report (as prepared by our <br /> firm) shall be performed to correlate the existing <br /> conditions, problems and viable solutions for <br /> corrective action. <br /> Phase # 3 : Project Scheduling <br /> We shall prepare a tentative work sequence schedule for <br /> the Owner's representative, to establish time frames <br /> for all phases of Engineering, Design, and Construction <br /> work to be performed. <br /> Phase # 4 : Performance Criteria Analysis <br /> Due to the sensitive and reactive nature of the roofing <br /> systems available today, a Performance Criteria <br /> Analysis shall be developed in order to determine the <br /> actual requirements of the roof membrane, insulation, <br /> attachment procedure, drainage, customized details, <br /> etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.