Browse
Search
Agenda - 05-15-2007-6c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 05-15-2007
>
Agenda - 05-15-2007-6c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:53:22 PM
Creation date
8/28/2008 11:50:27 AM
Metadata
Fields
Template:
BOCC
Date
5/15/2007
Document Type
Agenda
Agenda Item
6c
Document Relationships
Minutes - 20070515
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
S Purchasing - Bordeaux Construction Inc Justice Facility Expansion
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Justice Facility Project <br />Summary of Bid <br />Value Engineering Detail <br /> <br />---- <br />Bid Summary <br />Base Bid $9,899,500 <br />Farmer's Market $196,500 <br />River Park $85,700 <br />AlternateA-3 Pavillion $62,000 <br />Total Gross Construction $10,243,700 <br />Less: <br />Accepted Value Engineering Items: -$166,862 <br />Total Proposed Bid Award for construction $10,076,838 <br />ption Amount <br />,ccepted Value Engineering Items Detail: <br />1echanically Attached TPO for roof -$7,01 <br />refinished 24 gauge metal in lieu of aluminum -$9,70 <br />taircase with h/m tempered in lieu of firelite -$46,45 <br />limination of 8' chain link construction fence -$1,37 <br />revision of C2.0, C3.0 dated 3/26/07 -$1,15 <br />oilet fixture renovation deletion X113,114,203,204 -$39,44 <br />:ast stone coping in lieu of metal coping -$7,74 <br />,Iternative to Carpet/Carpet Tile -$22,97 <br />ise existing supply and return air -$1,50 <br />:eramic Tile alternative -$22,34 <br />Deletion of air temp sensor inputs -$65 <br />VC waste and vent piping where permissable -$6,50 <br />otal value engineering items -$1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.