Browse
Search
Agenda - 05-15-2007-6c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 05-15-2007
>
Agenda - 05-15-2007-6c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 10:53:22 PM
Creation date
8/28/2008 11:50:27 AM
Metadata
Fields
Template:
BOCC
Date
5/15/2007
Document Type
Agenda
Agenda Item
6c
Document Relationships
Minutes - 20070515
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2007
S Purchasing - Bordeaux Construction Inc Justice Facility Expansion
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: May 15, 2007 <br />Action Agenda <br />Item No. ~p ~- G _ <br />SUBJECT: Justice Facility Expansion Bid Award and Contract Approval <br />DEPARTMENT: Purchasing and Budget PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): <br />Bid Tabulation <br />Value Engineering Schedule <br />Letter from DeVere Construction Co. <br />INFORMATION CONTACT: <br />Pam Jones, Purchasing 919 245-2652 <br />Donna Coffey, Budget 919 245-2151 <br />PURPOSE: To consider awarding a bid and approving a contract with Bordeaux Construction, <br />Inc., Durham, NC for the 40,227 square foot new construction and renovation of the Orange <br />County Justice Facility; and to approve the withdrawal of a bid without forfeiture of <br />accompanying bid bond from DeVere Construction Company, pursuant to NC GS 143-129.1. <br />BACKGROUND: Bids were received for the Justice Facilities Expansion project on February <br />22, 2007, with Bordeaux Construction, Inc. submitting the lowest responsible bid that was <br />responsive. <br />As a reminder, the project consists of three major components: <br />• An addition to the existing courthouse, as well as some limited renovations to some areas <br />within the existing courthouse. This portion of the project also includes the construction <br />of amulti-purpose pavilion that will be~ situated on Margaret Lane and will serve as a <br />transit stop and public information area; and <br />• Construction of a public market house for use as a farmer's market. This portion of the <br />project also includes the addition of remote restroom facilities adjacent to the existing <br />Sheriff's office to serve the Market and park areas; and <br />• Construction of some trails and limited low impact recreation areas in the River Park. <br />Since the bid opening, County staff has collaborated with the project team, including Corley <br />Redfoot Zack (architect), Jeff Thompson (contract project manager) and the proposed <br />contractor to identify value engineering (VE) elements that would reduce the project cost without <br />overall adverse impact on project outcome. The identified VE elements are listed on the <br />attached schedule. <br />The facility expansion project includes several sustainable design elements that are integrated <br />into the design of the facility, including but not limited to, significant daylighting strategies and a <br />geothermal heating system for the new and existing portions of the building. The rainwater <br />collection system for the building was bid as an alternate; however, it is not recommended for <br />award due to the significant construction cost ($142,870) and the significant payback period. <br />Funding beyond that contemplated in this abstract would be required should the Board choose <br />to include the rainwater collection system in the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.