Browse
Search
Agenda - 01-19-1993 - VIII-H
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 01-19-1993
>
Agenda - 01-19-1993 - VIII-H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2017 3:59:18 PM
Creation date
1/3/2017 3:35:46 PM
Metadata
Fields
Template:
BOCC
Date
1/19/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19930119
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Phase II Contract <br /> Page 6 <br /> 2. Inventory forms, inventory folders, labels, and negative envelopes <br /> required fox inventory. Nomination forms for nomination projects. <br /> 3. Clerical support for integrating photographs into Statewide Survey <br /> files. <br /> 4. Data entry into CREP program. <br /> 5. Archival storage and maintenance of inventory materials including <br /> negatives. <br /> 6. Professional instruction and guidance in defining, the research <br /> design, conducting, and completing the inventory or preparation of <br /> nominations. A staff member of Archives and History will be <br /> assigned to work directly with the Consultant to serve as liaison <br /> with the Division and to provide on-site and office assistance, <br /> guidance throughout the project, support in conducting the work <br /> and assistance in evaluation according to National Register <br /> criteria and appropriate contexts. Review and approval of the <br /> inventory essay and National Register nominations by the Survey <br /> and Planning Branch is required. <br /> 7. Processing and printing of black and white photographs at Division <br /> cost, if desired by Grantee. A cost list will be provided to the <br /> Grantee for various photography items. <br /> NOTE: The Division seeks to process photographs quickly to <br /> expedite the inventory projects, but problems of labor and <br /> supplies sometimes generate long backlogs. A three-week <br /> processing time is usual, but sometimes six weeks to two months <br /> may occur. If the Grantee chooses to use the Division's photo lab <br /> services, the Grantee acknowledges the possibility of backlogs <br /> noted as above. <br /> 8. Presentation coordination of Study List to the State Professional <br /> Review Committee. <br />
The URL can be used to link to this page
Your browser does not support the video tag.