Browse
Search
Agenda - 01-19-1993 - VIII-H
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 01-19-1993
>
Agenda - 01-19-1993 - VIII-H
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2017 3:59:18 PM
Creation date
1/3/2017 3:35:46 PM
Metadata
Fields
Template:
BOCC
Date
1/19/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19930119
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Phase II Contract <br /> Page 4 <br /> This information is to be recorded--to the extent space allows--on <br /> the blank pages of the data sheets and additional 8X10 sheets, and <br /> referenced by source and date of the conversation/interview. <br /> 4. The recording of any property includes the making of color slides <br /> of the property, as appropriate. In some instances there may be <br /> one slide of the property where in other cases of more significant <br /> buildings, there may be up to a dozen slides of the property, its <br /> pertinent details, its outbuildings, and its site. <br /> 5. The Consultant and Local Coordinator will make presentations at <br /> one to three public meetings to inform community of project and <br /> obtain information and support; additional presentations will be <br /> negotiated separately. <br /> 6. The Consultant with the assistance of the Local Coordinator and <br /> Division Representative, will make a Study List presentation <br /> (written and oral) to the State Professional Review Committee <br /> encompassing property and districts evaluated as eligible for the <br /> National Register of Historic Places. <br /> D. FINAL REPORT: <br /> At the end of the project the Consultant will submit to the Division a <br /> final report before final reimbursement is made. This report will <br /> follow instructions in the NC Survey Manual and appropriate Federal <br /> bulletins. The report and the survey files will be reviewed by the <br /> Division staff and revised by the Consultant and the revisions approved <br /> before final payment is made. Time should be allowed for revision. <br /> The final report will be a professionally written essay evaluating the <br /> general historical and architectural development of the project area. <br /> The essay will be organized as a Multiple Property Documentation Form, <br /> with historic contexts and property types, and will follow the guides <br /> set out in Bulletin 16: Guidelines for completing National Register of <br /> Historic Places Forms, pp. 17-35. The final submission shall also <br /> include all survey materials described in item C.2.a.-f. above prepared <br /> to Division standards. <br /> Note: The grantee will also receive a copy of the final report. (The <br /> Grantee will also obtain duplicate files, photocopies of survey <br /> forms, duplicate proofs, and entries. ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.