Orange County NC Website
School Facilities Finance Act of 1987 Form LRP <br /> reproduce n <br /> G <br /> needed <br /> as <br /> 1993 LONG RANGE PLAN . <br /> INDIVIDUAL SCHOOL DATA WORKSHEET <br /> ADMINISTRATIVE UNIT- ORANGE COUNTY PRIORITY NUMBER 4 <br /> NAME OF NEW/EXISTING SCHOOL C. w. STANFORD MIDDLE <br /> NAME OF SCHOOL(S) THIS PROJECT REPLACES N/A <br /> GRADES NOW 7-8 GRADES PROPOSED 6-8 <br /> MEMBERSHIP NOW 900 IN FIVE YEARS 675 IN TEN YEARS, 800 <br /> NEW ELEM. SCHOOL- DESIGN MEMBERSHIP X sq.ftJPUPIL X$78.00=$ <br /> NEW MIDDLE SCHOOL- DESIGN MEMBERSHIP X sq.ft/PUPIL X$78.00=$ <br /> NEW HIGH SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> • IF YOUR COST DATA HAS BEEN ESTABLISHED; CROSS OUT$78 AND ENTER YOUR TOTAL COST <br /> • INTERPOLATE THE sq.It/PUPIL USING THE 'THEORETICAL PROFILES'OR YOUR ED SPEC DATA <br /> ADDITIONS-USE THE 'THEORETICAL PROFILE"&THE "FACILITYSTANDARDS"AS A CHECKLIST <br /> NUMBER NAME OF SIZE OF COST <br /> OF SPACE SPACE @$78.00 <br /> SPACES <br /> TOTAL X 1.35 = $ <br /> CIRCULATION, <br /> TOILETS&MECHANICAL <br /> OTHER PROJECTS <br /> REMODELING & RENOVATION $ 605.000 DESCRIPTION OF <br /> AIR CONDITIONING $ REMODELING&RENOVATION <br /> WATER SYSTEM $ ADD NATURAL GAS SERVICE AND <br /> SEWER SYSTEM $ REPLACE BOILER/GYM HEAT <br /> ASBESTOS ABATEMENT$ SYSTEM. CONVERT SHOP TO <br /> ADA MODIFICATIONS$ VOC ED LAB. GENERAL REFUR- <br /> EQUIPMENT$ BISI-IMENT <br /> OTHER $ <br /> LAND ACQUISITION $ <br /> SEE 'FACILITYSTANDARDS"FOR SITE SIZE <br /> RECOMMENDATIONS <br /> TOTAL COST FOR INDIVIDUAL PROJECT$ 605,000 <br /> LIST THIS TOTAL ON LRP-1 A OR 1B IN PRIORITY ORDER <br />