Browse
Search
Agenda - 01-04-1993 - VIII-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 01-04-1993
>
Agenda - 01-04-1993 - VIII-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 3:20:36 PM
Creation date
1/3/2017 8:44:18 AM
Metadata
Fields
Template:
BOCC
Date
1/4/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-B
Document Relationships
Minutes - 19930104
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ar JV ./.. tv.JO yOJJ '1JUU �mrtL RILL-GARx Q )— n �s <br /> F 1 "< <br /> School Facilities Finance Act of 1987 FvnM LAP <br /> ribeles <br /> 1993 LONG RANGE PLAN <br /> INDIVIDUAL SCHOOL DATA WORKSHEET <br /> ADMINISTRATIVE UNIT- ( e1 H111-Cambay PRIORITY NUMBER 4 <br /> NAME OF NEW/EXISTING SCHOOL Meg Middle School <br /> NAME OF SCHOOL(S)THIS PROJECT REPLACES _ <br /> GRADES NOW GRADES PROPOSED 6-8 <br /> MEMBERSHIP NOW 6,836 IN FIVE YEARS 9.CID IN TEN YEARS, RAI <br /> NEW ELEM.SCHOOL- DESIGN Irk x- sq.lt.PUPIL X$78.00•L$ <br /> -- -NEW MIDDLE SCHOOL= DESIGN AIEMBERSNIV X — 14 tRUPIL x PIM <br /> NEW HIGH SCHOOL- DESIGN NEWER*, x . sq.IL/PUPIL X$78.00=$ <br /> • IF YOUR COST DATA HAS SEEN ESTABU D; CROSS our Ili AND BOER YOUR TOTAL COST <br /> ' P rERPOL/1"rE THE sq.IUPLIPL USING THE°THEORE'1 *.PROMEr OR YOUR ED SPEC DATA . <br /> ADDMONS-USE THE 'THEORETICCAL PROFILE'S THE"FACILITY STANDARDS'AS A CHECKLIST <br /> NUMBER NAME OF SIZE OF COST <br /> OF SPACE SPACE 0*7$.00 <br /> SPACES _ I <br /> * 1 . .. ❑ - ., t� <br /> TOTAL. . . ' • • X 1:35 m$926.640 _• . cNC racainICAL <br /> OTHER PROJECTS <br /> REMODELING & RENOVATION$ I RENOVATION <br /> AIR CONDITIONING$ • REMODELING <br /> WATER SYSTEMS *a�tlt p riot frero new o,nat <br /> SEWER SYSTEM$ will-reed to t addad- <br /> ASBESTOS ABATEMENT$ <br /> ADA MODIFICATIONS$ - - <br /> EQUIPMENT "r <br /> OTHERS , <br /> LAND ACQUISITION s <br /> SEE 'F ACLITYSTANGIARDS'FOR SITE SIZE —..° <br /> RECOMMENDATIONS •' <br /> TOTAL COST FOR INDIVIDUAL PROJECT$ 926,640 <br /> UST THIS TOTAL ON LAP-1 A OR 10 IN PRIORITY ORDER <br />
The URL can be used to link to this page
Your browser does not support the video tag.