Orange County NC Website
P /4-93 <br /> School Facilities Finance Act of 1987 Form LRP <br /> reproduce 2 <br /> ea needed <br /> 1993 LONG RANGE PLAN _g <br /> INDIVIDUAL SCHOOL DATA WORKSHEET <br /> ADMINISTRATIVE UNIT- ORANGE COUNTY PRIORITY NUMBER 14 <br /> NAME OF NEW/EXISTING SCHOOL BUS GARAGE <br /> NAME OF SCHOOL(S) THIS PROJECT REPLACES <br /> GRADES NOW GRADES PROPOSED <br /> MEMBERSHIP NOW IN FIVE YEARS IN TEN YEARS <br /> NEW ELEM. SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$, <br /> NEW MIDDLE SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> NEW HIGH SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> • IF YOUR COST DATA HAS BEEN ESTABLISHED; CROSS OUT$78 AND ENTER YOUR TOTAL COST <br /> • INTERPOLATE THE sq.ft./PUPIL USING THE 'THEORETICAL PROFILES OR YOUR ED SPEC DATA <br /> ADDITIONS-USE THE 'THEORETICAL PROFILE"&THE "FACILITY STANDARDS"AS A CHECKLIST <br /> NUMBER NAME OF SIZE OF COST <br /> OF SPACE SPACE @$78.00 <br /> SPACES <br /> TOTAL X1.35 = $ <br /> CIRCULATION, <br /> TOILETS&MECHANICAL <br /> OTHER PROJECTS <br /> REMODELING & RENOVATION $ DESCRIPTION OF <br /> AIR CONDITIONING $ REMODELING dI RENOVATION <br /> WATER SYSTEM $ Renovation/ <br /> SEWER SYSTEM $ Bus Garage <br /> ASBESTOS ABATEMENT $ Addition <br /> ADA MODIFICATIONS$ <br /> EQUIPMENT$ <br /> OTHER $ <br /> LAND ACQUISITION $ 200,00o <br /> SEE "FACILITYSTANDARDS"FOR SITE SIZE <br /> RECOMMENDATIONS <br /> TOTAL COST FOR INDIVIDUAL PROJECT$ 200,000 <br /> LIST THIS TOTAL ON LRP-1 A OR 1 B IN PRIORITY ORDER <br />