Browse
Search
Agenda - 01-04-1993 - VIII-B
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 01-04-1993
>
Agenda - 01-04-1993 - VIII-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 3:20:36 PM
Creation date
1/3/2017 8:44:18 AM
Metadata
Fields
Template:
BOCC
Date
1/4/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
VIII-B
Document Relationships
Minutes - 19930104
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
School Facilities Finance Act of 1987 Form LRP <br /> reproduce 2 <br /> ea needed <br /> 1993 LONG RANGE PLAN <br /> INDIVIDUAL SCHOOL DATA WORKSHEET <br /> ADMINISTRATIVE UNIT- ORANGE COUNTY PRIORITY NUMBER 13 <br /> NAME OF NEW/EXISTING SCHOOL A. L. STANBACK <br /> NAME OF SCHOOL(S) THIS PROJECT REPLACES N/A <br /> GRADES NOW 6 GRADES PROPOSED Pre-K/Other <br /> MEMBERSHIP NOW 365 IN FIVE YEARS -- IN TEN YEARS __ <br /> NEW ELEM. SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> NEW MIDDLE SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> NEW HIGH SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> • IF YOUR COST DATA HAS BEEN ESTABLISHED; CROSS OUT$78 AND ENTER YOUR TOTAL COST <br /> • INTERPOLATE THE sq.ftJPUPIL USING THE"THEORETICAL PROFILES'OR YOUR ED SPEC DATA <br /> ADDITIONS-USE THE "THEORETICAL PROFILE"&THE "FACILITY STANDARDS"AS A CHECKLIST <br /> NUMBER NAME OF SIZE OF COST <br /> OF SPACE SPACE @$78.00 <br /> SPACES <br /> TOTAL X1.35 = $. <br /> CIRCULATION, <br /> TOILETS&MECHANICAL <br /> OTHER PROJECTS <br /> REMODELING & RENOVATION $ 875,000 DESCRIPTION OF <br /> AIR CONDITIONING $ REMODELJNG& RENOVATION <br /> WATER SYSTEM $ <br /> SEWER SYSTEM $ Replace Roof <br /> ASBESTOS ABATEMENT $ . Add Drop Ceiling/Lights <br /> ADA MODIFICATIONS $ . Add Central Air/Heat and <br /> EQUIPMENT$ Renovation <br /> OTHER $ <br /> LAND ACQUISITION $ <br /> SEE "FACILRYSTANDARDS"FOR SITE SIZE <br /> RECOMMENDATIONS <br /> TOTAL COST FOR INDIVIDUAL PROJECT$ 875,000 <br /> LIST THIS TOTAL ON LRP-1 A OR 1B IN PRIORITY ORDER <br />
The URL can be used to link to this page
Your browser does not support the video tag.