Orange County NC Website
School Facilities Finance Act of 1987 Form LRP <br /> reproduce 2 <br /> as needed <br /> 1993 LONG RANGE PLAN <br /> INDIVIDUAL SCHOOL DATA WORKSHEET <br /> ADMINISTRATIVE UNIT- ORANGE COUNTY PRIORITY NUMBER 17 <br /> NAME OF NEW/EXISTING SCHOOL CAMERON PARK ELEMENTARY <br /> NAME OF SCHOOL(S) THIS PROJECT REPLACES N/A <br /> GRADES NOW K-5 GRADES PROPOSED same <br /> MEMBERSHIP NOW 550 IN FIVE YEARS 650 IN TEN YEARS 71 5 <br /> NEW ELEM.SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> NEW MIDDLE SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> NEW HIGH SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> • IF YOUR COST DATA HAS BEEN ESTABUSHED; CROSS OUT$78 AND ENTER YOUR TOTAL COST <br /> • INTERPOLATE THE sq.IL/PUPIL USING THE'THEORETICAL PROFILES'OR YOUR ED SPEC DATA <br /> ADDITIONS- USE THE 'THEORETICAL PROFILE"&THE "FACILITY STANDARDS"AS A CHECKLIST <br /> NUMBER NAME OF SIZE OF COST <br /> OF SPACE SPACE @$78.00 <br /> SPACES <br /> TOTAL X1.35 = $ <br /> CIRCULATION, <br /> TOILETS&MECHANICAL <br /> OTHER PROJECTS <br /> REMODELING & RENOVATION $ 745,000 DESCRIPTION OF <br /> AIR CONDITIONING $ REMODEUNG& RENOVATION <br /> WATER SYSTEM $ <br /> SEWER SYSTEM $ Replace Roof Add Drop Ceiling, <br /> ASBESTOS ABATEMENT$ and Lights <br /> ADA MODIFICATIONS $ Add Carpet <br /> EQUIPMENT$ <br /> OTHER $ <br /> LAND ACQUISITION $ <br /> SEE "FACILRYSTANDARDS"FOR SITE SIZE <br /> RECOMMENDATIONS <br /> TOTAL COST FOR INDIVIDUAL PROJECT$ 745,000 <br /> LIST THIS TOTAL ON LRP-1 A OR 1B IN PRIORITY ORDER <br />