Orange County NC Website
School Facilities Finance Act of 1987 Form LRP <br /> reproduce <br /> as needed <br /> 199. 3 LONG RANGE PLAN <br /> INDIVIDUAL SCHOOL DATA WORKSHEET <br /> ADMINISTRATIVE UNIT- ORANGE COUNTY PRIORITY NUMBER 11 <br /> NAME OF NEW/EXISTING SCHOOL MAINTENANCE SHOP <br /> NAME OF SCHOOL(S) THIS PROJECT REPLACES <br /> GRADES NOW GRADES PROPOSED <br /> MEMBERSHIP NOW IN FIVE YEARS IN TEN YEARS <br /> NEW ELEM. SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> NEW MIDDLE SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> NEW HIGH SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00• $ <br /> • IF YOUR COST DATA HAS BEEN ESTABLISHED; CROSS OUT$78 AND ENTER YOUR TOTAL COST <br /> • INTERPOLATE THE sq.1t/PUPIL USING THE"THEORETICAL PROFILES'OR YOUR ED SPEC DATA <br /> ADDITIONS-USE THE 'THEORETICAL PROFILE"&THE "FACILITY STANDARDS"AS A CHECKLIST <br /> NUMBER NAME OF SIZE OF COST <br /> OF SPACE SPACE @$78.00 <br /> SPACES <br /> TOTAL X 1.35= $ <br /> CIRCULATION, <br /> TOILETS&MECHANICAL <br /> OTHER PROJECTS <br /> REMODELING & RENOVATION $ , DESCRIPTION OF <br /> AIR CONDITIONING $ REMODELING&RENOVATION <br /> WATER SYSTEM $ <br /> SEWER SYSTEM $ Renovate and add to <br /> ASBESTOS ABATEMENT$ Maintenance Facility <br /> ADA MODIFICATIONS $ <br /> EQUIPMENT$ <br /> OTHER $ 650,000 <br /> LAND ACQUISITION $ <br /> SEE "FACILf1YSTANDARDS"FOR SITE SIZE <br /> RECOMMENDATIONS <br /> TOTAL COST FOR INDIVIDUAL PROJECT$ 650,000 <br /> LIST THIS TOTAL ON LRP-1 A OR 1B IN PRIORITY ORDER <br />