Orange County NC Website
✓L/RP a —53 <br /> School Facilities Finance Act of 1987 reproduce 2 <br /> as needed <br /> 1993 LONG RANG E PLAN ® e <br /> INDIVIDUAL SCHOOL DATA WORKSHEET <br /> ADMINISTRATIVE UNIT- <br /> ORANGE COUNTY PRIORITY NUMBER. 10 <br /> NAME OF NEW/EXISTING SCHOOL ENERGY MANAGEMENT PROJECTS <br /> NAME OF SCHOOL(S)THIS PROJECT REPLACES <br /> GRADES NOW GRADES PROPOSED <br /> MEMBERSHIP NOW. IN FIVE YEARS, IN TEN YEARS <br /> NEW ELEM. SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> NEW MIDDLE SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> NEW HIGH SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> • IF YOUR COST HEA HA� PEUOUT$78 LEYOUR OST <br /> • INTERPOLA T sq. UILSING THE"THEORETICAL PROFILES'OR D SPEC DATA <br /> ADDITIONS-USE THE "THEORETICAL PROFILE"&THE "FACILITY STANDARDS"AS A CHECKLIST <br /> NUMBER NAME OF SIZE OF COST <br /> OF SPACE SPACE @$78.00 <br /> SPACES <br /> X1.35 = $ <br /> TOTAL CIRCULATION, <br /> TOILETS&MECHANICAL <br /> OTHER PROJECTS <br /> REMODELING & RENOVATION $ , DESCRIPTION OF <br /> AIR CONDITIONING $ REMODELING&RENOVATION <br /> WATER SYSTEM $ Add Energy <br /> SYSTEM $ <br /> ASBESTOS ABATEMENT $ Management Systems at all ADA MODIFICATIONS $. Sites <br /> EQUIPMENT$ <br /> OTHER $ 850,000 <br /> LAND ACQUISITION $ <br /> SEE "FACILITY STANDARDS"FOR SITE SIZE <br /> RECOMMENDATIONS <br /> TOTAL COST FOR INDIVIDUAL PROJECT$ 850,000 <br /> LIST THIS TOTAL ON LRP-1 A OR 1B IN PRIORITY ORDER <br />