Orange County NC Website
School Facilities Finance Act of 1987 Freorm pro dLAucP <br /> e 2 as needed <br /> 1993 LONG RANGE PLAN <br /> INDIVIDUAL SCHOOL DATA WORKSHEET <br /> ADMINISTRATIVE UNIT- ORANGE COUNTY PRIORITY NUMBER 7 <br /> NAME OF NEW/EXISTING SCHOOL EFLAND CHEEKS ELEMENTARY <br /> NAME OF SCHOOL(S) THIS PROJECT REPLACES N/A <br /> GRADES NOW K-5 GRADES PROPOSED SAME <br /> MEMBERSHIP NOW a15 IN FIVE YEARS aqn IN TEN YEARS 540 <br /> NEW ELEM. SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> NEW MIDDLE SCHOOL- DESIGN MEMBERSHIP X sq.ftJPUPIL X$78.00=$ <br /> NEW HIGH SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> • IF YOUR COST DATA HAS BEEN ESTABUSHED; CROSS OUT$78 AND ENTER YOUR TOTAL COST <br /> • INTERPOLATE THE sq.ftJPUPIL USING THE'THEORETICAL PROFILES'OR YOUR ED SPEC DATA <br /> ADDITIONS-USE THE 'THEORETICAL PROFILE"&THE "FACILITY STANDARDS"AS A CHECKLIST <br /> NUMBER NAME OF SIZE OF COST <br /> OF SPACE SPACE @$78.00 <br /> SPACES <br /> TOTAL X 1.35 = $ <br /> CIRCULATION, <br /> TOILETS&MECHANICAL <br /> OTHER PROJECTS <br /> REMODELING & RENOVATION $ 615,000 DESCRIPTION OF <br /> AIR CONDITIONING $ REMODELING& RENOVATION <br /> WATER SYSTEM $ REPLACE ROOF. ADD NATURAL GAS <br /> SEWER SYSTEM $ SERVICE AND CONVERT HEATING <br /> ASBESTOS ABATEMENT $ SYSTEM. RENOVATE GYM <br /> ADA MODIFICATIONS $ <br /> EQUIPMENT$ <br /> OTHER $ <br /> LAND ACQUISITION $ <br /> SEE 'FACILITYSTANDARDS"FOR SITE SIZE <br /> RECOMMENDATIONS <br /> TOTAL COST FOR INDIVIDUAL PROJECT$ 615,000 <br /> LIST THIS TOTAL ON LRP-1 A OR 1B IN PRIORITY ORDER <br />