Orange County NC Website
School Facilities Finance Act of 1987 Form LRP <br /> reproduce 0 <br /> as needed <br /> 1993 LUNG RANGE PLAN <br /> INDIVIDUAL SCHOOL DATA WORKSHEET <br /> ADMINISTRATIVE UNIT- ORANGE COUNTY PRIORITY NUMBER 5 <br /> NAME OF NEW/EXISTING SCHOOL G. A. BROWN ELEMENTARY SCHOOL <br /> NAME OF SCHOOL(S) THIS PROJECT REPLACES N/A <br /> GRADES NOW K-5 GRADES PROPOSED SAME <br /> MEMBERSHIP NOW 530 IN FIVE YEARS 625 IN TEN YEARS 690 <br /> NEW ELEM. SCHOOL- DESIGN MEMBERSHIP X sq.ft/PUPIL X$78.00=$ <br /> NEW MIDDLE SCHOOL- DESIGN MEMBERSHIP X sq.ft/PUPIL X$78.00=$ <br /> NEW HIGH SCHOOL- DESIGN MEMBERSHIP X sq.ft./PUPIL X$78.00=$ <br /> • IF YOUR COST DATA HAS BEEN ESTABLISHED; CROSS OUT$78 AND ENTER YOUR TOTAL COST <br /> • INTERPOLATE THE sq.f./PUPIL USING THE'THEORETICAL PROFILES'OR YOUR ED SPEC DATA <br /> ADDRIONS-USE THE 'THEORETICAL PROFILE"&THE "FACILITY STANDARDS"AS A CHECKLIST <br /> NUMBER NAME OF SIZE OF COST <br /> OF SPACE SPACE @$78.00 <br /> SPACES <br /> TOTAL X 1.35 = $ <br /> CIRCULATION, <br /> TOILETS&MECHANICAL <br /> OTHER PROJECTS <br /> REMODELING & RENOVATION $ 350.000 DESCRIPTION OF <br /> AIR CONDITIONING $ REMODELING& RENOVATION <br /> WATER SYSTEM $ REPLACE BOILER AND PARTIAL <br /> SEWER SYSTEM $ ROOF REPLACEMENT <br /> ASBESTOS ABATEMENT$ <br /> ADA MODIFICATIONS $ <br /> EQUIPMENT$ <br /> OTHER $ <br /> LAND ACQUISITION $ <br /> SEE "FACILI7YSTANDARDS"FOR SITE SIZE <br /> RECOMMENDATIONS <br /> TOTAL COST FOR INDIVIDUAL PROJECT$ 350,000 <br /> 'ST TNIR TOTAI ON I_RP-1 A OR 1B IN PRIORITY ORDER <br />