Browse
Search
Agenda - 01-04-1993 - III-E
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1993
>
Agenda - 01-04-1993
>
Agenda - 01-04-1993 - III-E
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 3:22:36 PM
Creation date
1/3/2017 8:40:06 AM
Metadata
Fields
Template:
BOCC
Date
1/4/1993
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
III-F-E
Document Relationships
Minutes - 19930104
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> After the property was zoned, Hancor expanded the area <br /> used for outdoor storage of finished pipe to include the <br /> 4. 23 acre area adjacent to Highway 70 which was not zoned <br /> for industrial use. This area consists of two lots which <br /> were purchased by Hancor in 1979, but were not actually <br /> used until after Cheeks Township was zoned. A grading <br /> permit was obtained in 1989. However, there was no zoning <br /> permit requested or issued. The expansion violated the <br /> Zoning Ordinance because the storage was a part of an <br /> industrial land use, but occurred on land zoned R-1 (Rural <br /> Residential) . <br /> Hancor, Inc. is now requesting that the 4 .23 acres <br /> adjacent to Highway 70 be zoned Light Industrial, <br /> consistent with the remainder of their property. The <br /> rezoning will bring the existing outdoor storage area into <br /> compliance with the Zoning Ordinance. <br /> The Hancor site is within one of the four target areas <br /> being analyzed and reviewed by the Planning Board/Economic <br /> Development Work Group. The target area is generally <br /> bounded by I-85 on the south, the Southern Railway on the <br /> north, Buckhorn Road to the west and the Redman Homes <br /> facility to the east. A small portion of the target area <br /> extends north of the railroad from Buckhorn Road, and to <br /> the property just east of Hancor, Inc. <br /> The Planning Board/Economic Development strategies include <br /> rezoning of the target areas to allow administrative <br /> approval of appropriate commercial and/or industrial <br /> development. The proposed rezonings will be presented for <br /> public hearing in February, and will include the rezoning <br /> of all four target areas, as well as specific performance <br /> and design standards. <br /> Hancor is proposing to expand its manufacturing operation, <br /> and construction is scheduled to begin in early 1993 . The <br /> applicant preferred to submit a rezoning application <br /> independent of the Planning Board/EDC work effort in order <br /> to maintain its schedule for development, and not take the <br /> risk that development standards will change to the point <br /> that the current development plans are not feasible. <br /> The rezoning request has been reviewed by Staff and found <br /> to comply with the findings necessary for approval of a <br /> rezoning request. <br /> Property which is zoned I-1 must: <br /> 1) be designated as Commercial or Industrial <br /> Transition Area in the Land Use Plan, <br /> 2) be of a size appropriate to the method of water <br /> supply and sewage disposal, and <br /> 3) have direct frontage on a collector road or major <br /> arterial. <br />
The URL can be used to link to this page
Your browser does not support the video tag.