Browse
Search
Agenda - 05-18-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 05-18-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 3:54:53 PM
Creation date
12/14/2016 4:19:37 PM
Metadata
Fields
Template:
BOCC
Date
5/18/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820518
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11028 <br /> they shall assume responsibility for the maintenance,upkeep, repair and <br /> replacement of these utilities and wholly assume all the costs of these <br /> responsibilities. All sewer and water service shall be provided by the <br /> municipality, private association or sewer and water authority at its <br /> prevailing rates. <br /> It shall be Orange County policy to require that when a County- <br /> financed sewer or water extension is connected to a municipality owned <br /> _ and operated sewer or water system, then the municipality shall enter - <br /> into an agreement with the County providing that in the event the project <br /> served is annexed by the municipality, it shall pay to the County any County <br /> share of the project not recovered by the development. <br /> Oversizing of Utilities: It shall be the policy of the County to <br /> require that Water and sewer utilities will be built to the standards and <br /> specifications of the municipality, private association or sewer and <br /> water authority to whose system they are connected. Water and sewer utilities <br /> extended to a development under this policy shall be of such design and <br /> size to serve not only that development but also any existing or antici- <br /> pated development within the area of the development. The additional <br /> capacity to be installed at the time of extension to a development shall <br /> be based on good engineering practice and shall be determined by the long- <br /> range plans of the utility system to which it is connected in conjunction <br /> with assessments of potential growth and service need in the area as deter- <br /> mined by Orange County. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.