Orange County NC Website
uwi52 ba4 — /62 2, — 1-10 <br /> RESULTS OF BID OPENING <br /> OWNER: Willie Gattis " APPLICATION NUMBER 79 <br /> ADDRESS: P.O. Box 774 Hillsborough, NC COST ESTIMATE: 7,954.00 <br /> PERCENTAGE OF BID OVER 1.63 UNDER COST ESTIMATE <br /> CHECK ONE: JOB BID I x 1 JOB NEGOTIATED F1 <br /> COMPANY BID AMOUNT <br /> L McDuffie Construction 8,085.00 <br /> 2. Gates Construction 9,118:70 <br /> 3. Taylor Home Improvement 10,220.00 <br /> 4. Morrow Construction 8,900.00 <br /> 5, , Temco Construction 9,570.00 <br /> Frank Griffin Assocaites 7,995.00 <br /> Bids opened by: Robert Wilson <br /> Time of Bid Opening: 3:00 •.m. <br /> Date of Bid Opening: April 5, 1982 <br /> Witnessed by: Wilbert McAdoo <br /> ********************************************************************************* <br /> Lowest Acceptable Bid: 8,085.00 <br /> Negotiated Amount: , N/A <br /> Contractor: McDuffie Construction <br /> NAME , <br /> Rt. 4, Box 402, Hillsborough, NC 27278 <br /> ADDRESS <br /> 732-6901 <br /> PHONE NUMBER <br /> COMMENTS: Frank H. Griffin Associates was low bidder on DU 079 & 81. Department <br /> policy states, upon initial enrollment a contractor will be awarded <br /> only one (1) job until his performance can be monitored. (Frank <br /> Griffin Associates has not performed any jobs under the County's <br /> program). McDuffie Construction was the second lowest bidder, the <br /> contract should be awarded to this company. Frink Griffin <br /> Associates should be awarded a contract for DU # 81. <br /> Submitted by: <br /> ---77e1 DATE: <br /> Bid Approved by: <br /> Proceed Order: Issued Not Issued <br /> COMMENTS: <br />