Browse
Search
Agenda - 03-08-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 03-08-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 4:53:34 PM
Creation date
12/14/2016 3:13:49 PM
Metadata
Fields
Template:
BOCC
Date
3/8/1982
Meeting Type
Public Hearing
Document Type
Agenda
Document Relationships
Minutes - 19820308
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U0746 <br /> 11. That the developer pay 1/3 of the cost of a <br /> new 1,000 gal./minute pumper so that Orange <br /> Grove Fire Co. can provide protection for <br /> all its district in a safe, efficient manner. <br /> 12. That the North Carolina EdNiSiOn of Environ- <br /> mental Management approve the final plans <br /> for the sewage collection and disposal <br /> system, prpr to the start of any const- <br /> ruction, that is served by the central system. <br /> That the Orange County Health Department issue <br /> an improvements permit prior to the start of <br /> any construction facilities served by an in <br /> ground sewage disposal system. <br /> 13. That the access road be named and a road sign <br /> to Orange County standards be erected at the <br /> intersection. <br /> 14. That the road in the project be publically built <br /> dedicated and build to North Carolinatepart- <br /> ment of Transportation Standards. <br /> 15. That there be a 100t building and parking <br /> area setback around the perimeter of the <br /> site. That this area be heavily landscaped <br /> with evergreen bushes and shrubs, to minimize <br /> the impacts on adjacent property. <br /> 16. A final boundary survey of the Project and <br /> improvements shall be recorded by the dev- <br /> loper at the time the Special Use Permit <br /> is recorded. Plat shall show all easements, <br /> road rights-of way, perimeter building set- <br /> back lines, and lot lines. <br /> 17. That the continued maintenance of the pUblic <br /> improvements (water/sewer) is guarenteed by <br /> a security instrument. <br /> 18. That the airport construction be started with- <br /> in 6 months of final approval and that cons- <br /> truction of all improvements be completed with- <br /> in 2 years. <br /> 19. That the airport shall meet all Federal Aer- <br /> onautics Administration (FAA) design standards <br /> for the basic classification of general <br /> aviation airport. The applicant shall obtain <br /> from the FAA a letter certifying that the <br /> airport does meet their standards, <br />
The URL can be used to link to this page
Your browser does not support the video tag.