Browse
Search
Agenda - 03-08-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 03-08-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 4:53:34 PM
Creation date
12/14/2016 3:13:49 PM
Metadata
Fields
Template:
BOCC
Date
3/8/1982
Meeting Type
Public Hearing
Document Type
Agenda
Document Relationships
Minutes - 19820308
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(TO 6:1.3 <br /> 2. For Basic Transport, without instrument approach requires <br /> 20 to 1 slope with surface is 500' wide near runway end, 1,000' <br /> long, 700' wide at outer end. For instrument runways, the surface <br /> has a 34 to 1 slope, 500' by 1700' by 1010'. <br /> 3. No approach surfaces are shown for proposed Midway Airport. <br /> However, the road on the south end and into the office complex <br /> violates these standards. It is likely that the approach areas <br /> on each end of the runway have trees or power lines that also <br /> are not in compliance. The airport owner should control these <br /> areas to prevent obstructions which might be flight safety hazards. <br /> Mr. Irvin: Do you know if the owner controls that distance of approach? <br /> Mr. Luce: No, I don't know. <br /> - <br /> Mr. Irvin: Don't the owner's plans show the boundary lines at 250' - <br /> beyond the runway? Does he control the other 750'? <br /> Mr. Luce: No. <br /> Mr. Irvin: How many motor vehicle trips will be generated by this <br /> project? <br /> Mr. Cannity: The latest information is from DOT in 1981 for that section <br /> of Highway 54, it's 4600 trips; by going to acceptable standards, I estimate <br /> 378 trips per day for the airpark/Warehouse and for the airport, based on the <br /> per acre number, about 450 trips, and based on aircraft about 780. <br /> Mr. Irvin: That's about 14,000-15,000 trips total per day. <br /> Mt. Cannity: These figures are generally based on more urban areas <br /> than where this project is located. <br /> Mr. Irvin: Based on. the calculAtions for the amount of water and the <br /> number of trips, would you say this corresponds to a "fairly sizeable town?" <br /> Mr. Cannity: For the number of trips; I think in Orange County, only <br /> maybe 1-85 or 15-501 in Chapel Hill would come close to that level of use. For <br /> the Volume of water, the amount estimated, 130,000 is a reasonably small amount. <br /> Mr. Irvin: So, souebody, maybe the County, may have to someday provide <br /> increased services? <br /> Mr. Cannity: Someday, that's possible. I don't know if the County is <br /> ready to do that new, <br /> Mr. Irvin: I have some questions of Mr. Mehler. <br /> Mr. Mehler: May I respond to those questions you asked the staff? <br /> Chairman Whiffed: We need to expedite this; you will have an opportunity <br /> at the end of the meeting to respond. <br /> Mr. Irvin: Does the Buck Mountain Campany have the approach easements <br />
The URL can be used to link to this page
Your browser does not support the video tag.