Orange County NC Website
00712 <br /> d) Specific requirements of all <br /> special use requests: <br /> 8.8 a) The following additional infer- The follOWing are specific req- <br /> mation is required for all Special Use direments for this special use <br /> Applications: request: <br /> Three copies of the Site Plan prepared A site Plan has been supplied. <br /> by a registered North Carolina land sur- <br /> veyor or engineer which shall contain <br /> the following: - - <br /> 1. North Point scale and date. 1. North Point, scale and date <br /> shown. <br /> 2. Extent of area to be developed. 2. The extent of area to be <br /> developed is indicated on the <br /> Plans. The developers, indicate <br /> in the narrative that they are <br /> requesting approval of the con- <br /> cept plan and that they expect <br /> to request a Special Use Permit <br /> for each building when the part- <br /> icular use for the tract has <br /> been determined. <br /> 3. Locations widths of all easements 3. Rights of way on public <br /> and rights of way within or adjacent roads are shown in the plan. <br /> to the site. They are all 60' wide and all <br /> roads will be public and built <br /> tO*N.6. D.O.T. standards. <br /> There are no sanitary sewer <br /> easements shown on the plat. <br /> Easements for all "public <br /> sewers" shall be required,these <br /> will be 30' wide. Anytire a <br /> sewer line goes over private <br /> property it should be cons- <br /> idered "public". <br /> 4. Location of all existing or pro- <br /> posed structures on the site. . The site plan should be <br /> concept only. Each lot will <br /> be required to apply for a <br /> Special Use Permit, at that <br /> time exact building location <br /> and parking arrangements will <br /> be shown. <br /> 5. Location of all areas on the site 5. There are no flood prone <br /> subject to flood hazard or inundatiion areas on the site. <br /> as shown on flood maps or soil's maps. <br /> 6. Location of all water courses on 6. There are no water courses <br /> the site, including direction of flow, shown on the site plan. <br /> 7. Existing topography at a countour 7. Existing topography is shown. <br /> interval of five feet based on mean <br /> level datum. <br /> • <br />