Browse
Search
Agenda - 03-01-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 03-01-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 11:58:44 AM
Creation date
12/14/2016 2:35:00 PM
Metadata
Fields
Template:
BOCC
Date
3/1/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820301
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Engineering fee shall be by hourly charges listed in Section IV of <br /> this Agreement, not to exceed $4500, payable monthly. <br /> The Engineering Services under this item shall also include docu- <br /> mentable project formulation work performed by the ENGINEER. under <br /> an agreement with the OWNER dated January 6, 1981, for which project <br /> formulation work the ENGINEER has not received reimbursement as of <br /> _ the date of this Agreement. Payment by the OWNER to the ENGINEER <br /> under this Agreement for project formulation work performed before- <br /> the date of this Agreement shall be in lieu of any further payments <br /> under the January 6, 1981 agreement, and payments under this Agreement <br /> shall be included within the above-stated fee limit of $25.00 for this <br /> Item IIA. <br /> B. Preliminary surveying as required. <br /> Preparation of construction plans and specifications and contract <br /> documents. <br /> Preparation of a detailed cost estimate and an erosion control plan <br /> for the construction of all improvements. <br /> Engineering fee shall be $9,800, payable monthly in proportion to <br /> work accomplished. <br /> C. Presentation of plans and specifications for approval to, and <br /> securing approval from appropriate regulatory agencies, including <br /> North Carolina Division of Environmental Management. <br /> Engineering fee, due upon completion, shall be $1,000. <br /> D. Property surveying as required, for the purpose of easements or <br /> rights-of-way. Preparation of easement and right-of-way agreements. <br /> Engineering fee shall be $40.00 per easement. <br /> E. Securing of easements and right-of-way agreements, if requested by <br /> the OWNER. Engineering fee shall be by unit hourly charges in <br /> accordance with the Schedule in Section IV of this Agreement. <br /> F. Assistance in receiving bids for construction, including preparing <br /> legal advertisements, answering contractors' questions, conducting <br /> the bid opening', and preparation of a certified bid tabulation. <br /> Engineering fee, due upon completion, shall be $900. <br /> G. Engineering services during construction, including: <br /> --Stakeout of all work for construction. <br /> --Conducting a preconstruction conference. <br /> --Engineering inspection of construction to insure that construction <br /> is performed according to contract specifications, and conducting <br /> final inspection of all street improvements with officials of the <br /> NC Department of Transportation. <br /> --Administration services during construction, including reviewing <br /> contractors' monthly payment requests, preparing and processing <br /> change orders, coordination with regulatory agencies, approval of <br />
The URL can be used to link to this page
Your browser does not support the video tag.