Browse
Search
Agenda - 03-01-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 03-01-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 11:58:44 AM
Creation date
12/14/2016 2:35:00 PM
Metadata
Fields
Template:
BOCC
Date
3/1/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820301
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• xiT r,4"...:"Z'P.7-,AW 7:L6a:TaKCMZaeiMdalaIIIMElaaaonseansusw.a...m.....+m•.... ......-.Aw <br /> e. Standards for roads and streets will be adopted in ac- <br /> cordance with the Chapel Hill-Carrboro TransPortation <br /> Plan subject to the courtesy review process. <br /> f. Standards for police and fire services wAli be adopted <br /> subject to the courtesy review process. <br /> g. Within the Joint Planning Area the specifications and <br /> standards of OWASA are accepted by the governmental <br /> units as the development standards for water and sewer <br /> services. <br /> ARTICIR 3. WATER AND SEWER EXTENSIONS <br /> The planning and extension of water and sewer services in the <br /> Joint Planning Area shall be accomplished in confonmance with <br /> the policies of OWASA and the following general principles: <br /> a. Water and sewer extensions should be made in a manner <br /> which conforms to the Joint Planning Area land use <br /> plan. <br /> b. Water and sewer extensions outside the corporate bound- <br /> aries of the Towns should be made within the timing <br /> and locational framework provided for in the Joint <br /> Planning Area land use plan categories: <br /> Joint Planning Area: Ten Year Transition <br /> Joint Planning Area: Twenty Year Transition <br /> Joint Planning Area: Rural <br /> Joint Planning Area: University Lake Watershed <br /> c. Water and sewer extensions should be considered in <br /> light of the policy of the Towns and County to promote <br /> infill development in the Towns. <br /> d. The extension of water and sewer lines in the Joint <br /> Planning Aera is most appropriate in the area desig- <br /> nated Joint Planning Area: Ten Year Transition, first <br /> and the Joint Planning Area: Twenty Year Transition, <br /> second. <br /> e. The extension of water and sewer lines in the Joint <br /> Planning Area: Rural and Joint Planning Area: <br /> University Lake Watershed should be discouraged. <br /> f. The extension of water and sewer lines into a new <br /> drainage basin should be considered in light of <br /> the facility and desireability of serving the ehtirety <br /> of a drainage basin. <br /> g. The sizing of water and sewer extension lines should <br /> reflect the prinicples Outlined above. <br /> The courtesy review process for water and sewer extensions is contained <br /> in an Addendum to the Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.