Browse
Search
Agenda - 02-16-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 02-16-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 11:10:29 AM
Creation date
12/14/2016 2:29:52 PM
Metadata
Fields
Template:
BOCC
Date
2/16/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820216
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> WORK OBJECTIVE 12B: UTILITIES SECTION OF LAND USE CODE <br /> 6 MONTH REPORT: <br /> No work thus far. <br /> PROJECTIONS FOR NEXT 6 MONTHS: <br /> This needs to be completed in the next (6) months. <br /> WORK OBJECTIVE 12C: WRITE STREETS SECTION OF LAND USE CODE <br /> 6 MONTH REPORT: <br /> This objective is mostly complete. <br /> PROJECTIONS FOR NEXT 6.MONTHS: <br /> • It will require one or two staff meetings for comment on it <br /> and, assuming no major changes or additions, several days <br /> for rewrite to produce final draft. When ZOTAC is resur- <br /> rected, the meetings will need to be staffed on this as well <br /> as staff the Planning Board if they begin their review this <br /> work year. <br /> WORK OBJECTIVE 13: DEVELOP THROUGHFARE STUDY <br /> -6 MONTH REPORT: <br /> This objective is complete except for a final rewrite based <br /> on staff comment requiring several days work at most. <br /> WORK OBJECTIVE 3.4: IMPACT CHECKLIST <br /> 6 MONTH REPORT: <br /> Staff has produced several drafts of the impact checklist. <br /> These have not been used yet. <br /> PROJECTIONS FOR NEXT 6 MONTHS: <br /> The existing checklist will be combined with the impact <br /> 410 checklist, but this work has been pushed aside by more <br /> pressing work. It will need to be included in our work <br /> program for the next (6) months. <br /> WORK OBJECTIVE 15: AREA PLANS FOR COUNTY ACTIVITY NODE AND <br /> TRANSITION AREAS <br /> 6 MONTH REPORT: <br /> No work has been done in this objective. <br /> PROJECTIONS FOR NEXT 6 MONTHS: <br /> Work is scheduled to begin on this work objective in January <br /> in conjunction with the Economic Development Policy. <br />
The URL can be used to link to this page
Your browser does not support the video tag.