Orange County NC Website
• <br /> PROJECTIONS FOR NEXT 6 MONTHS: <br /> This objective should be removed due to reduction and downgrading <br /> of S & E staff until full staff is resumed. <br /> WORK OBJECTIVE 10: GIVE INPUT INTO OTHER GOVERNMENTAL AGENCIES <br /> LAND USE PLANS, RESOURCE CONSERVATION PROJECTS, <br /> ENGINEERING GUIDELINES, ENVIRONMENTAL IMPACT, <br /> SITE DESIGN/PLANNING, STORM WATER MANAGEMENT, <br /> WATER QUALITY, SOILS INFORMATION AND GENERAL <br /> SURVEY PROBL <br /> 6 MONTH REPORT: EMS <br /> The erosion control officer currently serves on the design and <br /> development review staff for the town of Chapel Hill. This <br /> committee meets periodically. A field inspection and written <br /> comments are required for every preliminary construction pro- <br /> ject that is reviewed. The S & E staff currently serves as a <br /> technical consultant to the towns of Carrboro and Hillsborough. <br /> Proposed construction projects are reviewed in the field and on <br /> the plan for both municipalities. The above listed technical <br /> assistance is provided on a regular basis, <br /> PROJECTIONS FOR NEXT 6 MONTHS: <br /> Chapel Hill's Development review committee should require at <br /> least 6 meetings. Carrboro Planning should also require at <br /> least 6 meetings. <br /> WORK OBJECTIVE 11: DEVELOP A POLICY AND PROCEDURES.MANUAL <br /> 6 MONTH REPORT: <br /> Development of the above manual is currently underway. The <br /> erosion control officer is now preparing handwritten chapters <br /> of the manual andlis presently doing all research necessary. <br /> The next major step is to decide on a format for thebook, <br /> type a rough draft and encorporate the graphics (of which <br /> there will be a considerable amount). The erosion control <br /> officer is the sole participant in the preparation of this <br /> • manual. <br /> PROJECTION FOR NEXT 6 MONTHS: <br /> This objective will be delayed until next fiscal year due <br /> to tha downgrading and reduction of staff. <br /> WORK OBJECTIVE 12: ASSIST IN THE DEVELOPMENT OF 1 CHAPTER FOR <br /> 6 MOUTH REPORT: <br /> No work on this objective. <br /> ecItAiNIUSE CODE ON FLOODING, DRAINAGE, <br /> EROSION AND STORMWATER MANAGEMENT <br />