Browse
Search
Agenda - 02-16-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 02-16-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 11:10:29 AM
Creation date
12/14/2016 2:29:52 PM
Metadata
Fields
Template:
BOCC
Date
2/16/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820216
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 17 <br /> PROJECTIONS FOR NEXT 6 MONTHS: <br /> There will be 24 weekly staff meetings. <br /> WORK OBJECTTVE MANDATED BY BOARD OF COUNTY COMMaSSIONERS DIRECTIVE <br /> OBJECTIVE 7 <br /> WORK OBJECTIVE 7: MONITOR STATE REGULATED CONSTRUCTION PROJECTS <br /> 6 MONTH REPORT: <br /> There are 20 state regulated sites in Orange County. This <br /> staff has conducted 40 inspection trips and reported violations <br /> to tho state office. <br /> PROJECTIONS FOR NEXT 6 MONTHS: <br /> There will continue to be 20 state regulated sites that will <br /> require 40 inspection trips. However, the objective should <br /> be reduced due to reduction and downgrading of S & E staff to <br /> about 20 inspections. <br /> OTHER WORK OBJECTIVES ADOPTED IN THE BUDGET (OBJECTIVES 8-13) <br /> WORK OBJECTIVE 8: PROVIDE TECHNICAL ASSISTANCE TO DEVELOPERS AND <br /> CITIZENS ON EVERY ASPECT OF TECHNICAL SITE <br /> ENGINEERING, DESIGN AND TECHNICAL INFORMATION <br /> OTHER THAN SOIL AND EROSION RELATED INFORMATION <br /> 6 MONTH REPORT; <br /> Technical information on the above subjects is given on a day- <br /> to-day basis. Site design and engineering assistance is usually <br /> given with every erosion control field inspection. Field in- <br /> vestigations are made for individual county residents requesting <br /> this type of technical assistance. <br /> PROJECTION FOR NEXT 6 MONTHS: <br /> This objective should be removed due to reduction and downgrading <br /> of S E staff until full staffing is resumed. <br /> WORK OBJECTIVE 9: PLAN REVIEW AND TECHNICAL ENGINEERING AND DESIGN <br /> 4110 INFORMATION DURING THE PLAN REVIEW PROCESS OTHER <br /> THAN SOIL AND EROSION <br /> 6 MONTH REPORT: <br /> On every plan submitted for approval this staff gives technical <br /> design and engineering information into the plan review process. <br /> This type of information includes, site design and layout re- <br /> commendations, watershed information, pipe sizing, catch basin <br /> and curb inlet locations, channel design, grading plans, retention <br /> pond design, soils information, landscape design and horticultural <br /> recommendations, site construction details, etc, There were 23 <br /> plans reviewed, which includes both regular plans and plans to <br /> receive a plan exemption form, <br />
The URL can be used to link to this page
Your browser does not support the video tag.