Browse
Search
Agenda - 02-16-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 02-16-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 11:10:29 AM
Creation date
12/14/2016 2:29:52 PM
Metadata
Fields
Template:
BOCC
Date
2/16/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820216
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br /> All these sites require a field visit. <br /> There were 16 plans reviewed for a grading permit (over 40,000 <br /> square feet disturbed) and 13 plans reviewed for a plan exemption <br /> form (between 20,000 and 110,000 square feet disturbed) during the <br /> 6 month period for a total of 29 plans reviewed during July 1, 1961- <br /> December 31, 1981. <br /> PROJECTIONS FOR NEXT 6 MONTHS: <br /> There will be 16 plans reviewed for grading permits and 13 <br /> plans reviewed for a plan exemption form during the next <br /> 6 months. This will total 29 plans for the next 6 months. <br /> WORK OBJECTIVE 4: INSPECT ALL NEW MINOR AND MAJOR SUBDIVISIONS <br /> IN UNINCORPORATED ORANGE COUNTY FOR DRAINAGE <br /> AND FLOODING PROBLEMS <br /> 1110 6 MONTH REPORT: <br /> There were 49 minor subdivisions and 10 major subdivisions <br /> inspected an average of 2.26 sites per week during the 6 <br /> month period. <br /> PROJECTION FOR NEXT 6 MONTHS: <br /> There should be 50 minor subdivisions, 10 major subdivisions <br /> with an average of 2 inspections per site. • <br /> WORK OBJECTIVE #5: INSPECT ALL NEWLY CONSTRUCTED PRIVATE ROADS <br /> 6 MONTH REPORT: <br /> All private roads require at least 2 site inspections; an <br /> initial inspection and a final inspection, However, most <br /> private roads are inspected more than twice. Al]. of the <br /> design and technical engineering required to construct the <br /> roads (layout, pipe sizing, etc.) are provided to the developer <br /> through this office. <br /> PROJECTION FOR NEXT 6 MONTHS: <br /> • Due to the downgrading and reduction of S & E staff the work <br /> objectiVe has been transfered to Current Planning. <br /> WORK OBJECTIVE 6: ATTEND COUNTY STAFF SUBDIVISION REVIEW MEETINGq <br /> 6 MONTH REPORT: <br /> Staff attended a weekly county planning department staff <br /> meetings to give input in the development process. Work <br /> load for the past 6 months is approximately 10 meetings with <br /> field inspections for each subdivision reviewed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.