Orange County NC Website
00440 <br /> 9. The pedestrian circulation system shall serve each <br /> unit, it shall be cleared and grubbed path at least <br /> 8 wide, The surface treatment shall be suitable for <br /> easy walking. <br /> 16. The recreation areas shall be cleared and grassed, <br /> a hard surfaced basketball court installed and 2 <br /> tot lots built. The first area shall be completed <br /> before work starts on units 39-75. The second <br /> recreation area shall be completed before the <br /> last ten units are completed. • <br /> 11. A final boundary survey of the Planned Development <br /> and improvements shall be recorded by the developer, <br /> 12. The development shall be built and run according to <br /> the site plan, and written narrative supplied by <br /> the developer, and in compliance with the above <br /> conditions. <br /> • /sw <br /> • <br /> 4 <br /> 19 <br />