Browse
Search
Agenda - 01-25-1982
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1982
>
Agenda - 01-25-1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 9:58:58 AM
Creation date
12/14/2016 2:14:35 PM
Metadata
Fields
Template:
BOCC
Date
1/25/1982
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19820125
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UO42f}. <br /> A RESOLUTION RECOMMENDING APPROVAL OF A PD-OI FOR DUKE POWER COMPANY <br /> BE IT RESOLVED by the Council of the Town of Chapel.. Hill that the <br /> Council hereby recommends that the Orange County Board of Commissioners <br /> approve the request for a Planned Development-Office and Institutional <br /> for property located at the northwest corner of NC 86 and Homestead <br /> Roads subject to the following stipulations: <br /> 1. That both driveway access points on Homestead Road be located to <br /> achieve a sight distance of 462 feet each way for each driveway. <br /> That plans for these relocated driveways, including topographic <br /> contours acrc3s the roadway or a profile of the roadway be submitted <br /> to the Town Manager for his approval prior to construction. <br /> 2. That left turn lanes and right turn deceleration lanes meeting the <br /> requirements of the Chapel Hill Design Manual be provided prior to <br /> issuance of a certificate of occupancy, <br /> 3. That all parking and storage areas with the exception of those to <br /> be used for heavy equipment parking and equipment storage be paved <br /> to the standards contained in the Chapel Hill design and construction <br /> manuals. <br /> 4. That the proposed pedestrian access to NC 86 be relocated to the <br /> intersection of Homestead Road and NC 86. <br /> 5. That the proposed dumpster be placed on a 10' x 20' concrete pad, <br /> 6"thick, with wire mesh. <br /> 6. That the applicant dedicate additional right-of-way, as necessary, <br /> along the frontage of the subject property with Homestead Road and <br /> NC 86 to achieve the following standards: <br /> For NC 86, 45 feet of right-of-way measured from the center1�, <br /> For Homestead Road, 40 feet of right-of-way measured from <br /> the centerline. <br /> 7. That at such time as public sewer service is available within <br /> 200 feet of the site, that the applicant will connect to that <br /> system. <br /> This the llth day of January, 1982. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.