Orange County NC Website
DocuSign Envelope ID:EFA03109-4B44-47A5-81C8-B2143EC99265 <br /> LAJ Imo o b(,,, <br /> TITLE IF 6,1OR US Whittled Domptlex Flooring Lippe les <br /> LaCATIOD: Richard I U I i Complete, 300 ca.Trych Read, Hillsborough NC <br /> precte,„td : November 8,2016 <br /> Tire*:330 hie <br /> Location: 13 hilted Complex,300 ch.Tr treel„ Hillsborough, NC 2'1278 <br /> Ris,fuested Staff hate: November 21,2016 <br /> hoqueitait Compiettan Date: December 23,2016 <br /> Soog,i, of Olefin <br /> Pre/vibe Dada and IlItaterialls for%Haag per tit:swings <br /> T-1: Code Summary Sheet,datedJ 10118110.3 <br /> 214 Sl FL,Key Rand,. Genera0 Notes, Flooring Schedule, dated 10121/10 <br /> Ati2 First Faker Key Plant EnrOarged Key Plan, Elevators, (Deals, Flooting Schedule,dated 10121116 <br /> work cuall tatt accordaryre wnh Orange County losbections gen Enefroornetital Health agencies rules <br /> cad relpflagons, <br /> Contractow shah goducle permits le overall costa )40 "3612,13,47-161 ith <br /> work ett be caffecrefal deming normal boas of opelation,stig the exceplion of the 111 floor Orange <br /> County Health Department Medlical Receptionist Room carpet installation <br /> Contractors shall exclude all anal: related to 1 flax Natty service witodcw.and fire alarm control panel <br /> installation, ittio tasegent5 hoop au beta , <br /> Ca tin project award contractor.shall provide as schedule and pan includleig the dates for oath 04 the <br /> locations work MO be purl inen <br /> All work must be ocitasinated wigh Orange County Capital Paged Manager(OD DPW,and building <br /> tenants end approved priCi WI start.0:got:actor MO be required to,anertil itiarty Meetings with Orange <br /> Courts la review btogress and schesillie for upcoming van, <br /> Seely Comply with Orange Countas Safety&Shourily Chtigelirea,plus ell OS'tA and the federal, <br /> state and local safely and health requirements. <br /> Please provide,breakdown for the bid per line ll'eems,listed boom: <br /> Item 1 Vinyl Floor <br /> Maleriair $ $7711579. <br /> Labor $212„3112t21,13 <br /> Tax(if begin:shay 1193 <br /> Freight Of&H 41 $ 241. <br /> dt, <br /> Tfaal Item 1: Sig SYS 407 <br /> Item 2:CrIret Floortrit <br />